Building Pathology L3 Cedar / Lancaster School Flashcards
1
Q
Explain the advice you gave about the heave of the concrete floor.
A
2
Q
Described the defects you identified and explain how you assessed them (L2).
A
3
Q
What readings did you get with your damp meter – explain these readings in the context of the % moisture in the concrete floor (L2).
A
4
Q
Explain the advice about testing to confirm the cause of the defect?
A
5
Q
Explain the advice you offered to resolve this problem in the long term.
A
6
Q
What advice did you give regarding the cost of the works?
A