BOP ESFAS Flashcards

1
Q

What actuations occur if RU-29, Train A Control Room ventilation rad monitor failed high?

A

Trains A and B CREFAS
Operators use an ARP to mitigate

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What actuates on a CREFAS?

A
  • Normal ventilation dampers close
  • CR essential outside air dampers open
  • Both CT pumps start (makeup to EC and EW surge tanks)
  • CR essential AHU fans start
  • EW, SP, EC pumps start
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Describe the Bypass function of the BOP ESFAS.

A

Bypass is implemented via a key lock switch
Bypasses the test and trip functions but the channel can still be cross tripped

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Describe the power supply arrangement for BOP ESFAS.

A

Train A = PNA-D25 and PKA-D21
Train B = PNB-D26 and PKB-D22

The power supplies for each cabinet are auctioneered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Describe the RU monitors associated with BOP ESFAS.

A

FBEVAS
- RU-31 = SFP area monitor
- RU-145 = FB ventilation exhaust
CPIAS
- RU-37/38 = Containment Purge ducts in the east wrap (140’ AB)
CREFAS
- RU-29/30 = sample intake air from the CR ventilation system

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Explain the different modes of operation of the load sequencer

A

0 - No Input. Normal mode in standby
1 - SIAS/CSAS, no LOP
2 - SIAS/CSAS, with a LOP
3 - LOP only
4 - Misc. (AFAS, CREFAS, CRVIAS, FBEVAS, DGSS, DG Run)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly