BIM SOP Flashcards

1
Q

Which of the following is NOT a common application of BIM?

A

Information Technology (IT)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

In a parametric model a window object knows it’s a window, thus it knows that when the wall adjacent to the window moves two feet, it moves with it. This allows changes to the design to be captured in the model. T/F

A

True

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Choose the correct term to fill in the blank: The advantage of 3D is that, because every component is represented in true virtual space in a digital database __________ can identify conflicts in 3D space by identifying areas where two objects occupy the same point in 3D space.

A

Clash analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

True or False: An object in a BIM model can contain a finite number of no more than fifty attributes, including information about quantities or materials and the associated costs. T/F

A

False

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

A designated BIM Integrator does all of the following EXCEPT:

A

Establish hardware specifications and standards

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

A BIM Implementation Plan does all of the following EXCEPT:

A

Outlines enterprise-level initiatives related to BIM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The Project Procedures Manual is a document that includes:

A

The BIM Implementation Plan

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

For certain cases the design or construction teams may not adopt a BIM approach, or may adopt only a limited or partial implementation of BIM. In these cases the Construction Manager should:

A

Consider developing a model

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of these Project Delivery Methods maximizes collaboration between the design team and the builder?

A

Integrated Project Delivery (IPD)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Which of these is the primary purpose of collaborative meetings during the design phase?

A

To support document control and reduce problems by establishing a transparent process and clear goals and responsibilities at regular intervals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which of the following is NOT a way that a model-based design approach can be used to inform the public and internal project stakeholders about the project?

A

The models afford the public full access to proprietary project information

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Who is responsible for maximizing the use of model-based analysis for budgeting and cost estimating during the design phase?

A

Construction Manager

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Which of these delivery processes must the CM be knowledgeable of with respect to the application of the BIM?

A

A variety of delivery processes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How can BIM be useful in pre-bid or pre-proposal meetings?

A

Visualize the project and scope to prospective bidders

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

How can BIM be useful in prequalifying bidders?

A

Allows the CM to validate the qualifications of the bids with regard to BIM capability.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Which of the following is NOT a reason to ensure that the details of the information to be included in the model are established and understood by all parties involved in the project?

A

The BIM is always a contractual document representing the design.

17
Q

Which of the following is NOT a potential benefit of 4D modeling to the construction schedule?

A

Guarantees schedule conformance

18
Q

How can using the BIM mitigate additional costs on the project?

A

Allows the team to visualize project conditions and examine different solutions

19
Q

Which of these uses of the BIM is NOT a potential benefit to the building owner and/or facility manager?

A

Monitoring current temperature and humidity within the facility

20
Q

How can using software to link operations and maintenance documentation to the as-built models be useful post-construction?

A

Assists in developing operating procedural documentation and training information that can be accessed through a link to the Building Information Model