Banbury Floods CS Flashcards
Which road was raised as a result of flood management
A361
was a flood wall built to try help manage floods
yes a flood wall was built around the motorsport company Prodrive
What types of flood management occurred
- new pumping stations built to transfer rainwater
- A 4.5 metre, 2.9 km embankment was built using 100,000 tonnes soil from a borrow area next to the railway track
What did the Biodiversity Action Plan do
It planted and made ponds, trees and hedgerows to absorb and store excess water
What were the social benefits of the Banbury floods
- A361 raised
- reduced fear and anxiety of flooding
- quality of life increased with new footpaths and green areas
What were the economic benefits and costs of the Banbury floods
- costs of £18.5 million
- By protecting 441 houses and 73 commercial properties, the benefits are estimated to be over £100 million
Is the Biodiversity Action Plan an economic or environmental benefit
environmental benefit