AR 750-1 army matterial Maintencance Unit Maintenance Program Flashcards
What DA PAM covers TAMMS ?
DA PAM 750-8
What does TAMMS stand for ?
The army Maintenance management system
What DA PAM covers motor pool operations ?
DA PAM 750-35
What are 2 levels of maintenance ?
Field and sustainment (operator, direct, support, and depot)
PMCS means ?
Preventive maintenance checks and services
When is PMCS required to be performed
Before during and after operating equipment and at weekly and monthly intervals
What type of Manuel are is used to perform operator level PMCS
Operator manual 10 level
What is a class 1 leak ?
Seepage if fluid not great enough to form drops
What’s is a class 2 leak ?
Fluid leakage enough to form drops but not enough for the drops to fall
What is a class three leak
Fluid leakage large enough to form drops and drip from vehicle equipment
What does PLL stand for ?
Prescribed load list
How many days does a basic PLL sustain a unit ?
15 days
What is a TM ?
Technical manual, which outlines specific scope of repairs on equipment
What AR covers the Army material maintenance policy ?
AR 750-1
What is AOAP ?
Army oil analysis program, designed to save oil through scheduling