API 578 Flashcards

1
Q

PMI test method (3)

A

X-ray emission spectrometry, optical emission spectrometry, or wet chemical analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

PMI within the warehouse should not be regarded as

A

an alternative to PMI of the fabricated assets when PMI is specified.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

the greatest number of material nonconformances with serious consequences have involved placing

A

unapproved carbon steel components into low-alloy steel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Typical PMI records should contain the following: (5)

A

— reference to the PMI procedure(s) used;
— date of testing;
— test instrument identification number or serial number, where appropriate;
— name of each person performing the tests, with identification of their respective employer;
— results of the tests;

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

longitudinal welds should receive what type of PMI, and location

A

random, weld and base metal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

who is responsible to determine extent of alloy service before placed in service?

A

owner/user

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Techniques such as eddy-current sorting, electromagnetic alloy sorting, triboelectric testing (e.g. ferrite meters), and thermoelectric testing

A

are qualitative and as such may only be appropriate for limited sorting applications and not for specific alloy identification.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

API578 only applies to what material

A

metallic alloy, ferrous and non ferrous alloys

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Mill test reports should not be considered

A

a substitute for PMI , (used for QA)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

some types of components can have a higher likelihood of unapproved substitution of a nonspecified material. This can provide a basis for prioritizing specific equipment in a given system or process unit. Examples are:

A

— warm-up and bypass lines on pumps or check valves;
— small bore piping (2 NPS and below);
— valves, valve assemblies, and valve bonnets, and removable devices such as rupture disks, spacer blinds, blind flanges, plugs, or ring joint gaskets;
— thermowells;
— bolting;
— piping as a part of a packaged system;
— components without recognized marking;
— process systems with history of frequent maintenance requirements;
— welds;
— threaded components.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Identification of materials by visual stamps/markings alone should not be considered

A

as a substitute for PMI but may be an important component of an overall quality assurance program.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

testing on autogenous weld

A

conduct testing on only the base metal.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Calibration and/or verification of the PMI test equipment should be performed:

A

As specified the equipment manufacturer, if not by owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

if any one of a representative sample is rejected,

A

all items of that inspection lot should be considered suspect. A more extensive inspection of the remaining lot should be considered

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

When PMI indicates that alloying elements are outside the ranges indicated in the material specification, the owner/user may still choose to allow the use of the tested materials in situations where a person

A

knowledgeable of the appropriate damage mechanisms confirms that the material will perform satisfactorily in the service.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What safety considerations are there when performing PMI testing?

A

Consider electrical arching and “hot spots”. appropriate electrical and hot work permits.