API 570 Chap 8 Flashcards
ASME 31.3 is written for
design and construction of piping systems.
design, welding, examination, and materials also can be applied in the (4)
inspection, rerating, repair, and alteration of operating piping systems.
When ASME B31.3 cannot be followed because of its new construction coverage the piping engineer or inspector shall be guided by
API 570 in lieu of strict conformity
to ASME B31.3.
All repair and alteration work shall be done by a ______ and shall be authorized by the _______
repair organization / inspector prior to its commencement
The inspector will designate any inspection hold points required during _____
the repair or alteration sequence.
All proposed methods of design, execution, materials, welding procedures, examination, and testing shall be approved by the (2)
inspector or by the piping engineer
approval of on-stream welding is required from
owner/user
Welding repairs of cracks that occurred in-service should not be attempted without prior consultation with the piping engineer in order to
identify and correct the cause of the cracking.
The inspector shall approve all repair and alteration work at …..
designated hold points and after the repairs and alterations have been satisfactorily completed in accordance with the requirements of API 570
The design of temporary enclosures and repairs shall be approved
by the piping engineer.
Longitudinal cracks shall not be repaired with a sleeve unless
the piping engineer has determined that cracks would not be expected to propagate from under the sleeve.
what are consider temporary repairs? (3)
- on-stream, a full encirclement welded split sleeve
- box-type enclosure
- fillet patch
when can a temporary repair may be made by fillet welding a properly designed split coupling or plate patch over the pitted or locally thinned area (2)
If the repair area is localized and the SMYS (Specified Minimum Yield Strength) of the pipe is not more than 40,000 psi (275,800 kPa), and a Fitness-for-Service analysis shows it is acceptable
A fillet-welded patch shall not be installed
on top of an existing fillet-welded patch.
when installing a fillet-welded patch adjacent to an existing fillet-welded patch, the minimum distance between the toe of the fillet weld shall not be less than
d = 4 (Rt)^.5
d is the minimum distance between the toes of fillet welds of adjacent fillet weld attachments, in inches
(millimeters);
R is the inside radius in inches (millimeters);
t is the minimum required thickness of the fillet-welded patch in inches (millimeters).
Temporary repairs should be removed and replaced with a suitable permanent repair at the next available maintenance opportunity. Temporary repairs may remain in place for a longer period of time only if approved and documented by who?