Aeronautical Engineering Maintenance Management PG - 85-00-110-A Flashcards

1
Q

The __, shall be used to request Authorized Chemical Use List changes.

A

Aviation Technical Information Portal (ATIP), Deficiency Report (CG-22)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Change Process for Life Limit and Overhaul Intervals requests originate from __, __, and __ as Deficiency Report (CG-22)

A

Prime Units, ALC Product Lines, and maintenance or repair activities

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Entry Authority (confined space) is valid for __.

A

one year

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Units will conduct __ paper logbook record training to ensure that all aviation personnel are familiar with the use of each form, as appropriate to their job description.

A

yearly

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

WHEN SERVICING LOX IN AN EXERCISE OR TRAINING ENVIRONMENT, CHEMICAL WARFARE DEFENSE ENSEMBLES AND OTHER CHEMICAL WARFARE SUITS, INCLUDING CHEMICAL WARFARE MASKS, __.

A

WILL NOT BE WORN

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

BEFORE ENTERING ANY TANK FOR INSPECTION OR INITIATING REPAIRS, THE __ SHALL ALSO BE CHECKED FOR ADDITIONAL SPECIAL PRECAUTIONS THAT ARE REQUIRED.

A

ACMS MPC OR SPECIFIC AIRCRAFT MAINTENANCE MANUAL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

The radar antenna should not be operated within __ feet of any fueling, defueling, or similar operation unless a dummy load is installed that prevents the energizing of the antenna.

A

300

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Materiel shall be shipped to ALC or other designated repair facility with the appropriate documentation within __ of removal from service.

A

15 days

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

ENSURE THAT THE RESERVOIR IS __ BEFORE JACKING.

A

FIRMLY ATTACHED AND THE HANDLE IS SAFETIED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

ALL COLLET-EQUIPPED JACKS MUST HAVE THE __ TO PREVENT IT FROM BEING REMOVED FROM THE RAM.

A

RAM LOCKING NUT (OR COLLET), PEENED, OR STAKED

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

On collet-equipped jacks, the collet shall be kept within __ threads of the lift tube cylinders during raising and screwed down firmly to the cylinder after jacking is completed

A

two

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Outside jacking of aircraft will be permitted where __ are favorable.

A

wind conditions

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What warrants a PQDR?

A

Parts that fail beyond their mean time schedule and have an adverse affect on safe outcome of flight or adversely impact the ability to complete the mission

If a part fails to operate during testing after installation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

The QA briefing will be certified by the __ prior to beginning the Ground Check.

A

PIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

__ shall ensure that the Component Documentation procedures are strictly adhered to.

A

Commanding Officers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

The unit receiving an aircraft from a transferring unit shall submit a memorandum report to the Commanding Officer, ALC, with an information copy to Commandant, Office of Aeronautical Engineering (CG-41), transferring unit, and appropriate ALC Product Line Managers. This memorandum will include only those discrepancies encountered during the first __
of operational availability at the reporting unit.

A

14 days

17
Q

In no case shall the POST DELIVERY REPORT FOR TRIANGLE AIRCRAFT SWAP be submitted later than ___ after aircraft acceptance.

A

30 calendar days

18
Q

__ (for the affected aircraft/ALSE/SE) shall be included as information addressees on all Urgent Interim PQDRs.

A

Prime Units

19
Q

Low pressure and medium pressure __ hose assemblies (including Teflon) may be manufactured at unit level in accordance with AFTO 42E1-1-1.

A

(1500 PSI)

20
Q

Pre- formed and high pressure hoses __ will be pro- cured in accordance with existing instructions

A

(3000 PSI)

21
Q

A target of __ is a planning goal for NMCS rates (this equates to a parts availability rate of __).

A

5%, 95%

22
Q

NMCT rate of __.

A

29%

23
Q

FSCAP program is managed by Commandant __

A

(CG-41)

24
Q

The aviation performance qualifications are reviewed and revised by __

A

DCMS-81

25
Q

Maintenance errors contribute to approximately __ of DoD and commercial aviation mishaps.

A

20%

26
Q

Unit personnel who have attended the MRM Refresher Facilitator course within the previous __ years are qualified to facilitate refresher training at individual units.

A

2

27
Q

__ shall designate Unit MRM Refresher Facilitators in writing

A

Engineering Officers