Aeronautical Engineering Maintenance Management PG - 85-00-110-A Flashcards
The __, shall be used to request Authorized Chemical Use List changes.
Aviation Technical Information Portal (ATIP), Deficiency Report (CG-22)
Change Process for Life Limit and Overhaul Intervals requests originate from __, __, and __ as Deficiency Report (CG-22)
Prime Units, ALC Product Lines, and maintenance or repair activities
Entry Authority (confined space) is valid for __.
one year
Units will conduct __ paper logbook record training to ensure that all aviation personnel are familiar with the use of each form, as appropriate to their job description.
yearly
WHEN SERVICING LOX IN AN EXERCISE OR TRAINING ENVIRONMENT, CHEMICAL WARFARE DEFENSE ENSEMBLES AND OTHER CHEMICAL WARFARE SUITS, INCLUDING CHEMICAL WARFARE MASKS, __.
WILL NOT BE WORN
BEFORE ENTERING ANY TANK FOR INSPECTION OR INITIATING REPAIRS, THE __ SHALL ALSO BE CHECKED FOR ADDITIONAL SPECIAL PRECAUTIONS THAT ARE REQUIRED.
ACMS MPC OR SPECIFIC AIRCRAFT MAINTENANCE MANUAL
The radar antenna should not be operated within __ feet of any fueling, defueling, or similar operation unless a dummy load is installed that prevents the energizing of the antenna.
300
Materiel shall be shipped to ALC or other designated repair facility with the appropriate documentation within __ of removal from service.
15 days
ENSURE THAT THE RESERVOIR IS __ BEFORE JACKING.
FIRMLY ATTACHED AND THE HANDLE IS SAFETIED
ALL COLLET-EQUIPPED JACKS MUST HAVE THE __ TO PREVENT IT FROM BEING REMOVED FROM THE RAM.
RAM LOCKING NUT (OR COLLET), PEENED, OR STAKED
On collet-equipped jacks, the collet shall be kept within __ threads of the lift tube cylinders during raising and screwed down firmly to the cylinder after jacking is completed
two
Outside jacking of aircraft will be permitted where __ are favorable.
wind conditions
What warrants a PQDR?
Parts that fail beyond their mean time schedule and have an adverse affect on safe outcome of flight or adversely impact the ability to complete the mission
If a part fails to operate during testing after installation
The QA briefing will be certified by the __ prior to beginning the Ground Check.
PIC
__ shall ensure that the Component Documentation procedures are strictly adhered to.
Commanding Officers