Aeronautical Engineering Maintenance Management PG - 85-00-110-A Flashcards
The __, shall be used to request Authorized Chemical Use List changes.
Aviation Technical Information Portal (ATIP), Deficiency Report (CG-22)
Change Process for Life Limit and Overhaul Intervals requests originate from __, __, and __ as Deficiency Report (CG-22)
Prime Units, ALC Product Lines, and maintenance or repair activities
Entry Authority (confined space) is valid for __.
one year
Units will conduct __ paper logbook record training to ensure that all aviation personnel are familiar with the use of each form, as appropriate to their job description.
yearly
WHEN SERVICING LOX IN AN EXERCISE OR TRAINING ENVIRONMENT, CHEMICAL WARFARE DEFENSE ENSEMBLES AND OTHER CHEMICAL WARFARE SUITS, INCLUDING CHEMICAL WARFARE MASKS, __.
WILL NOT BE WORN
BEFORE ENTERING ANY TANK FOR INSPECTION OR INITIATING REPAIRS, THE __ SHALL ALSO BE CHECKED FOR ADDITIONAL SPECIAL PRECAUTIONS THAT ARE REQUIRED.
ACMS MPC OR SPECIFIC AIRCRAFT MAINTENANCE MANUAL
The radar antenna should not be operated within __ feet of any fueling, defueling, or similar operation unless a dummy load is installed that prevents the energizing of the antenna.
300
Materiel shall be shipped to ALC or other designated repair facility with the appropriate documentation within __ of removal from service.
15 days
ENSURE THAT THE RESERVOIR IS __ BEFORE JACKING.
FIRMLY ATTACHED AND THE HANDLE IS SAFETIED
ALL COLLET-EQUIPPED JACKS MUST HAVE THE __ TO PREVENT IT FROM BEING REMOVED FROM THE RAM.
RAM LOCKING NUT (OR COLLET), PEENED, OR STAKED
On collet-equipped jacks, the collet shall be kept within __ threads of the lift tube cylinders during raising and screwed down firmly to the cylinder after jacking is completed
two
Outside jacking of aircraft will be permitted where __ are favorable.
wind conditions
What warrants a PQDR?
Parts that fail beyond their mean time schedule and have an adverse affect on safe outcome of flight or adversely impact the ability to complete the mission
If a part fails to operate during testing after installation
The QA briefing will be certified by the __ prior to beginning the Ground Check.
PIC
__ shall ensure that the Component Documentation procedures are strictly adhered to.
Commanding Officers
The unit receiving an aircraft from a transferring unit shall submit a memorandum report to the Commanding Officer, ALC, with an information copy to Commandant, Office of Aeronautical Engineering (CG-41), transferring unit, and appropriate ALC Product Line Managers. This memorandum will include only those discrepancies encountered during the first __
of operational availability at the reporting unit.
14 days
In no case shall the POST DELIVERY REPORT FOR TRIANGLE AIRCRAFT SWAP be submitted later than ___ after aircraft acceptance.
30 calendar days
__ (for the affected aircraft/ALSE/SE) shall be included as information addressees on all Urgent Interim PQDRs.
Prime Units
Low pressure and medium pressure __ hose assemblies (including Teflon) may be manufactured at unit level in accordance with AFTO 42E1-1-1.
(1500 PSI)
Pre- formed and high pressure hoses __ will be pro- cured in accordance with existing instructions
(3000 PSI)
A target of __ is a planning goal for NMCS rates (this equates to a parts availability rate of __).
5%, 95%
NMCT rate of __.
29%
FSCAP program is managed by Commandant __
(CG-41)
The aviation performance qualifications are reviewed and revised by __
DCMS-81
Maintenance errors contribute to approximately __ of DoD and commercial aviation mishaps.
20%
Unit personnel who have attended the MRM Refresher Facilitator course within the previous __ years are qualified to facilitate refresher training at individual units.
2
__ shall designate Unit MRM Refresher Facilitators in writing
Engineering Officers