what is the point?

A

track maintenance or vehicles are required to move through a section
traffic fails to be detected by the signal
control section
consecutive signal fails in a section

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

the name is from controlled absolute

A

as in disc dwarf or home signals

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

nominated clearence point

A

this is where it will cease

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

authority in

A

signal at proceed, that signal should then be placed at stop with a blocking command

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

the area of block working

A

two adjacent controlled signal locations
or a controlled absolute signal and nominated clearance point