What are the tank dimensions and what type of tank is it?

A

182’-6” x 61-6” - CRT w/ IFR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

how many annular plate sections are we installing?

A

5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

what is the thickness of the annular plate we are replacing?

A

1/4” thick

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

what grade material are we replacing for the bottom plate?

A

A36

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

what kind of NDE are we to do as soon as we remove the bottom annular sections?

A

Visual exam and either MT or PT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What kind of nde must we do after installing the final pass on a new piece of annular ring?

A

it should be visually examined, vacuum box tested, and either pt or mt

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

who is to remove the existing insulation on the tank?

A

the existing insulation must be removed by others prior to us starting work on the bottom plates.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

what are we to do with the tank foundation beneath the annular plate replacement prior to installing new plates?

A

clean, visually inspect, and repair/replace damaged areas with clean asphalt fill

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

how much asphalt fill did we include in our proposal?

A

(1) 5 gallon bucket of asphalt filler for each of the annular plate replacement sections

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

How many lap welded patches are we installing in the critical zone?

A

3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what grade material are the patches to be installed in the critical zone?

A

A36

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

for the lap patches, what kind of NDE shall be done?

A

the root and final pass of all the lap welded patch plates shall be visually examined, vacuum box tested, and either MT or PT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

An existing floating roof anti-rotation cable is located at one of the new lap-welded patch plate locations. what will we do with this anti-rotation cable and what do we assume of it?

A

anti-rotation cable will be removed and reinstalled on the newly installed patch plate. We assume that this item is currently in serviceable condition.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what are we to do with the existing primary seal vapor barrier fabric?

A

remove and replace it and its associated hardware

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

regarding the primary seal, what will we be re-using?

A

the existing channel for the riser, the hanger assembly, and the primary shoe

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

what will we be doing with the secondary wiper seal?

A

remove and replacing

17
Q

regarding the secondary wiper, what will we be re-using?

A

the existing wiper riser

18
Q

per epa guidelines, what are we to do with the secondary seal?

A

we will be measuring and recording the gaps for the secondary seal gaps

19
Q

what is the last thing we will be doing per our sow?

A

installing new repair nameplate

20
Q

what have we excluded per our proposal?

A

coatings, strapping, commissioning, instrumentation, insulation, hydrotesting

21
Q

what is the approximate duration for the repairs?

A

9 days

22
Q

what is our proposed weekly work schedule?

A

6-10s

23
Q

we reserve the right to alter our work schedule at our sole discretion to ______.

A

maintain a safe, efficient, and quality project.

24
Q

a weather day constitutes as what?

A

less than 6 hours of work on a given day

25
Q

have we included weather make up days?

A

no

26
Q
A