60008 - Notes / Clarifications Flashcards

Familiarize self with project sow,notes,clarifications

1
Q

What is the customer project name?

A

ANL MNB EQP EOL Replacement 2024

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

what is the customer project # for this project?

A

A00OR-003655

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the customer spec # for this project?

A

V300-TA11-01-CL002-01

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Where is the location of the project?

A

baytown, tx

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What is the functional location of this project per the customer?

A

BTNMDIX-V300-TA11-CL002

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What is the customer equipment description?

A

Crude MNB tank

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What is the size and capacity of the equipment?

A

25’ ID x 24” shell height / 88, 128 Gal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What is the product stored for this project?

A

crude mono-nitrobenzene

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

what is the design sg for this project?

A

1.20 at 10F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

what is the design code for this project?

A

API 650 latest edition / Annex E, F.13, L, M, S, V &W ( L& W are common and left unstated in the design)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

what is the ma design temp?

A

200F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

what is the design metal temp?

A

20f

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

what is the designed liquid level?

A

24’

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

what is the design internal pressure?

A

2.5 PSIG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

what is the design external pressure?

A

-2.5” WC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

what is the CA for this project?

A

1/32” on plate and nozzle material

17
Q

what is the proposed shell thickness?

A

1/4”

18
Q

Did our proposed shell thickness consider all applicable loads per spec (internal, external) lifting lugs attachments and considered the fact that the entire tank upon fab on temp pad shall be lifted by provided lifting lugs on shell to install on foundation)

A

yes, proposed shell thickness considered this.

19
Q

for the shell to bottom test, after visual, are we going to PT or diesel test?

A

diesel test

20
Q

for the shell to bottom test, what nde do we need to do before we do a hydrostatic test?

A

Final PT

21
Q

what is the roof type for this project?

A

Cone

22
Q

what is the slope of the roof?

A

3.5” x 12”

23
Q

what kind of roof support is being proposed?

A

none

24
Q

what type of roof weld joints did we propose?

A

lap joints with seal weld underside

25
Q

what is the proposed roof thickness?

A

5/16”

26
Q

for the roof, has the proposed roof thickness considered CA?

A

yes

27
Q

for the roof, has the proposed roof thickness considered live load per customer spec?

A

yes

28
Q

For the roof, has the proposed roof thickness considered all other applicable loads per spec (internal/external) and the fact that the entire tank upon fab on temp pad shall be lifted by provided lifting lugs on shell to install on foundation?

A

yes

29
Q
A