60008 - As sold proposal Flashcards
what are the dimensions of this equipment and what type of equipment is it?
25’ dia x 24 Tall cone roof tank.
where is the site located?
baytown, tx.
for civil works, what optional pricing have we included?
optional pricing to have subcontractor to supply (36) 1” dia x 23” long stainless steel threaded anchor bolts with epoxy nut and washer based on an approximate embedment of 10”.
the anchor bolts will be installed after the tank is set in its final position, during the planned unit shutdown
our pricing is based on doing what kind of welding?
FCAW welding with ceramic backing
what is the optional welding method provided?
smaw
Who is the provide the temporary foundation?
customer
customer to provide a concrete area sized in accordance with the diameter of the tank foundation, which is what?
26’-3”
Company will required a matted or rocked in craneway around the tank area, measuring what?
16’ wide , 360 degree
what else will company need from customer to be provided regarding the foundation?
a 40’ x 40’ area to the west of the tank area for our equipment / tools / material laydown
the customer provided foundation must be _____.
level, flat surface, free of debris, of structural suitability for the weight of the tank and any lifting equipment adjacent to it.
Tarsco has included for nozzles and manways listed in _____________.
table 3 nozzle and manway schedule for the fixed roof, shell and bottom from the data sheet provided. Additional changes, as noted in clarification file are included.
What is our proposal excluding?
coatings, tank demo, tank strapping, commissioning, instrumentation, insulation, working under fresh breathing air.
What will be our work schedule?
5-10s
when will we determine mobilization date?
after receipt of PO
our proposal is based on final engineering information being _____.
being provided upon award
To meet required completion schedule, company engineering submittals shall be returned within _____.
10 calendar days of submittal.
if necessary, we suggest a face to face meeting to review the _________.
drawings to help expedite the approval process.
Construction activities are based upon normal working hours of _________.
10 hours per day, 5 days a week.
Company reserves the right to alter our work schedule are out sole discretion to __________.
maintain a safe, efficient, and quality project.
Please allow company to review schedule if _______.
improvement is required to meet business needs.
Have we included for weather make up days?
no
weather days will be added to the schedule on a ________.
day by day basis.