3.2 Technical Risk Management Flashcards
1
Q
Three Technical process tools that can assist in mitigating Technical risk
A
Modeling and Simulation (M&S)
Work Breakdown Structure (WBS)
Technical Performance Measurements (TPM)
2
Q
Modeling and simulation virtual prototypes support
A
Capability needs definition
Concept refinement
Design
Manufacturing
Testing
3
Q
Technical Performance Measures
A
Key metrics used to estimate the performance progress of a system or its subsystems
Used to measure and track progress of high-risk areas
example: Flying range, signal range