Critical Technical Parameters (CTPs)
Verification through Developmental Test and Evaluation (DT&E) to determine if the system met its performance thresholds
Critical Operational Issues (COIs)
Operational Test and Evaluation (OT&E) addresses these and determines the system’s capability to perform its mission
TEMP Evolution through Milestones
Milestone A: Initial approval
Milestone B: Updated and # LRIP Test Articles Determiend (Earliest Live Fire T&E Waiver Required)
Milestone C: May needed updating and final DT&E Report and Operational Assesment (OA) (Earliest DT&E Report Required)
FRP: May need updating, include IOT&E Assesment from Service and DOT&E (Earliest point a DOT&E Report on IOT&E required)
Four (4) Sections in the TEMP
DT&E
- Objecitves for Evaluation CTPs
- Test Design Concepts
- Modeling and Simulation
- Interoperability
- Compatibility
- Performance
Critical Technical Parameters (CTPs)
OT&E
- Critical Operational Issues (COIs)
- Live Fire
Measures of Effectiveness (MOEs) and Measures of Suitability (MOSs)
-