2.5 Developing the TEMP Flashcards

1
Q

Critical Technical Parameters (CTPs)

A

Verification through Developmental Test and Evaluation (DT&E) to determine if the system met its performance thresholds

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Critical Operational Issues (COIs)

A

Operational Test and Evaluation (OT&E) addresses these and determines the system’s capability to perform its mission

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

TEMP Evolution through Milestones

A

Milestone A: Initial approval

Milestone B: Updated and # LRIP Test Articles Determiend (Earliest Live Fire T&E Waiver Required)

Milestone C: May needed updating and final DT&E Report and Operational Assesment (OA) (Earliest DT&E Report Required)

FRP: May need updating, include IOT&E Assesment from Service and DOT&E (Earliest point a DOT&E Report on IOT&E required)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Four (4) Sections in the TEMP

A

DT&E
- Objecitves for Evaluation CTPs
- Test Design Concepts
- Modeling and Simulation
- Interoperability
- Compatibility
- Performance

Critical Technical Parameters (CTPs)

OT&E
- Critical Operational Issues (COIs)
- Live Fire

Measures of Effectiveness (MOEs) and Measures of Suitability (MOSs)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

-

A
How well did you know this?
1
Not at all
2
3
4
5
Perfectly