3-M Flashcards

1
Q

3-M

A

MAINTANENCE AND MATERIAL MANAGEMENT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

3-M MANUAL

A

NAVSEAINST 4790.8 series

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

PMS

A

PLANNED MAINTENANCE SYSTEMS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

3-M PURPOSE

A

DESIGNED TO PROVIDE:

  • MANAGING MAINTENANCE
  • MAINTENANCE SUPPORT
  • ACHIEVE MAXIMUM EQUIP OPERATIONAL READINESS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

3-M OBJECTIVES

A

-STANDARDIZATION
-EFFICIENCY
-DOCUMENTATION
-ANALYSIS
-CONFIGURATION STATUS ACCOUNTING
SCHEDULING

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

3-M SCOPE

A
  • ALL SHIPS NON AVIATION
  • NON APPLICABLE TO AERONAUTICAL
  • NON APPLICABLE TO NUCLEAR
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

OVERALL RESPONSIBILITY

A

CO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

3-M SYSTEM MANAGER

A

XO

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3-M SYSTEM COORDINATOR

A
  • OFFICER
  • CPO
  • SENIOR PO1
  • ITS THE SME
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

DEPARTMENT HEAD

A

RESPONSIBLE WITHIN THE DEPARTMENT FOR:

  • EFFECTIVE OPERATION OF 3-M
  • REVIEWS AND SIGN SCHEDULES
  • INSPECTS
  • ENSURES SUBMISSIONS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

DEPARTMENT LCPO

A

RESPONSIBLE FOR:

  • PROPER OPERATION OF 3-M
  • TRAINING
  • GUIDANCE
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

DIVISION OFFICER

A
  • QUALIFIED IN 3-M
  • ASSISTS IN MANAGING
  • REVIEWS AND APPROVES W SCHEDS
  • W SPOT CHECKS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

WORK CENTER SUPERVISOR

A
  • SENIOR PERSONNEL RESPONSIBLE
  • EFFECTIVE OPERATION OF 3-M
  • WEEKLY MAINTENANCE AND SUPERVISION
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

MAINTENANCE PERSONNEL

A

-PERFORM MAINTENANCE REQUIREMENTS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

3-M FORMS PURPOSE

A
TO STANDARDIZE:
-MAINTENANCE REQUIREMENTS 
-IMPROVE:
. EQUIPMENT READINESS
. FLEET OPERATIONAL READINESS
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

43P1

A

PMS MANUAL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

PMS

A

PLANNED MAINTENANCE SYSTEMS

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

LOEP’s

A

LIST OF EFFECTIVE PAGES

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

MIP’S

A

MAINTENANCE INDEX PAGE

20
Q

MRC’s

A

MAINTENANCE REQUIRED CARDS

21
Q

PMS MANUAL (43P1) IS DESIGNED TO

A

PROVIDE A READY REFERENCE OF PLANNED MAINTENANCE REQUIREMENTS FOR THE WORK CENTER SUPERVISOR

22
Q

LOEP’S PROVIDES

A

A LISTING OF MAINTENANCE INDEX PAGES (MIPs)

23
Q

MAINTENANCE INDEX PAGE PROVIDES

A

BASIC REFERENCE OF:

  • PUBLICATIONS
  • DESCRIPTIONS
  • MRCs
24
Q

MRC PROVIDES

A

DETAILED GUIDANCE OF:

  • REQUIREMENTS
  • HOW TO PERFORM
  • LIST THE TOOLS AND MATERIALS
25
Q

EGL IS USED TO

A
  • LOCATIONS OF COMPONENTS
  • MRC CODES
  • NAME OF COMPONENTS
  • SERIAL NUMBER
26
Q

FEEDBACK REPORT USED FOR

A

NOTIFY FLEET TECHNICAL SUPPORT CENTERS OR TYCOM ON MATTERS RELATED TO PMS

27
Q

TYPES OF FEEDBACK REPORT

A
  • CATEGORY A
  • CATEGORY B
  • CATEGORY URGENT
28
Q

CATEGORY A (FEEDBACK REPORT)

A

NON TECHNICAL IN NATURE

29
Q

CATEGORY B (FEEDBACK REPORT)

A

-TECHNICAL IN NATURE

30
Q

CATEGORY URGENT

FEEDBACK REPORT

A

SAFETY OF:

  • PERSONNEL
  • SHIP
  • POTENTIAL DAMAGE
31
Q

APL

A

ALLOWANCE PARTS LIST:

-IDENTIFICATION OF PMS PART REQUIREMENTS IN NAVY SUPPLY SYSTEM

32
Q

CSMP

A

CURRENT SHIP’S MAINTENANCE PROJECT:

  • DETAILED SUMMARY LIST
  • WORKLOAD PLANNING AND COORDINATION
33
Q

ESL

A

EQUIPMENT STATUS LOG:

-STATUS OF ALL EQUIPMENT WITHIN 3-M

34
Q

AEL

A

ALLOWANCE EQUIPMENT LIST:

-ALL EQUIPMENT NOT COVERED UNDER OTHER CATEGORIES

35
Q

COSAL

A

COORDINATED SHIPBOARD ALLOWANCE LIST:

  • EQUP. INSTALLED ON A SHIP TO PERFORM MISSION
  • REPAIR PARTS AND SPECIAL TOOLS
  • CONSUMABLES FOR SAFETY, CARE AND UPKEEP
36
Q

SPIN

A

STANDARD PMS ITEM NAME:

-NUMBERING SYSTEM FOR TOOLS, PARTS…

37
Q

SPMIG

A

STANDARD PMS MATERIALS IDENTIFICATION GUIDE:

-LISTS THE SPIN

38
Q

D,W,M,Q,S,A,R,U,LU,PM,SU

A

DAILY, WEEKLY, QUARTERLY, SEMIANNUALLY, ANNUALLY, SITUATIONAL, UNSCHEDULED,
LAY-UP, PERIODIC MAINTENANCE, START-UP

39
Q

WHAT PERIODICITY CODE IS “R”?

A

SITUTATIONAL

40
Q

WHAT PERIODICITY CODE IS SU?

A

START UP

41
Q

WHAT PERIODICITY CODE IS PM?

A

PERIODIC MAINTENANCE

42
Q

WHAT PERIODICITY CODE IS LU?

A

LAY-UP

43
Q

CYCLE SCHEDULE

A

YEAR LONG

44
Q

CYCLE IS DIVIDED IN…

A

3 MONTH QUARTERS

45
Q

QUARTERLY SCHEDULE

A

VISUAL DISPLAY OF PMS

UPDATED WEEKLY

46
Q

WEEKLY SCHEDULE

A

SHOWS ALL PLANNED MAINTENANCE SCHEDULE