1209.0 Foam Operations With Built In System Flashcards
1
Q
I. Starting Foam Operations:
B. Open the \_\_\_\_\_\_ valve (2), which is the same as opening the \_\_\_\_\_\_ \_\_\_\_\_\_\_\_ valve.
A
water / front discharge
2
Q
I. Starting Foam Operations
C. Close the \_\_\_\_\_\_\_\_ valve (3), which is the same as opening the \_\_\_\_\_\_\_\_ valve.
A
By-pass / eductor
3
Q
I. Starting Foam Operations
D. Open the \_\_\_\_\_\_ valve (4).
A
foam
4
Q
I. Starting Foam Operations
E. Set the pump to \_\_\_\_\_\_ PSI.
A
200 psi
5
Q
II. Stopping Foam Operations
A. Close the \_\_\_\_\_\_ valve(4). B. Reduce the pump to \_\_\_\_\_ psi.
A
foam / 100 psi
6
Q
II. Stopping Foam Operations
C. Open the \_\_\_\_\_\_ valve (5), and flow the hose line for \_\_\_\_\_\_\_ minutes. D. Close the \_\_\_\_\_\_ valve (5).
A
flush / three minutes / flush
7
Q
II. Stopping Foam Operations
E. Open the \_\_\_\_\_\_\_ valve (3), which is the same as closing the \_\_\_\_\_\_\_ valve. F. Close the \_\_\_\_\_\_\_ valve (2).
A
By-pass valve / eductor / water
8
Q
I. Starting Foam Operations
A. Select the desired percentage by adjusting the \_\_\_\_\_\_\_\_ valve(1).
A
metering valve