1201.1 Tactical Objectives Flashcards
II. Five (5) Tactical Objectives:
A. _____________________________:
1. The first arriving engine will establish? An \_\_\_\_\_\_ \_\_\_\_\_ should be positioned to attack the fire in an attempt to extinguish it quickly. 2. If \_\_\_\_\_\_\_ \_\_\_\_\_\_\_ is not possible due to fire conditions and the fire must be contained, report the inability to perform primary search to Command and the \_\_\_\_\_\_\_\_ \_\_\_\_\_. The IC will then take action to allow a primary search as soon as possible.
Primary Search and Attack Line command, deploy an attack line and start primary search attack line primary search reason why
II. Five (5) Tactical Objectives:
B. \_\_\_\_\_\_\_\_\_\_\_\_: 1. The second arriving engine is assigned the responsibility for \_\_\_\_\_\_\_\_ \_\_\_\_\_\_\_\_. 2. This crew will catch the most appropriate fire hydrant and connect a \_\_\_\_\_-\_\_\_\_\_ supply line to the \_\_\_\_ \_\_\_\_\_\_\_ engine on working incidents. Once the engine has accomplished this, the crew is available to complete other priorities as assigned by the IC, (i.e. primary search, backup line, or ventilation).
Water Supply:
water supply
five-inch
fire attack
I. Tactical Objectives
There are _____ Tactical Objectives for one-alarm structure fires. Under most circumstances they should be accomplished in the ______ listed. However, the sequence given is a __________ and in no way precludes the Incident Commander from making additional assignments or changing the order in which the priorities are accomplished.
five (5) / order / guideline
II. Five (5) Tactical Objectives:
C. \_\_\_\_\_\_\_\_\_\_ 1. After the first two (2) objectives have been assigned, the IC should consider assigning \_\_\_\_\_\_\_\_ to the next available crew. 2. The crew should have a minimum \_\_\_\_\_\_ personnel but may require more on large, complex assignments. When ventilation has been completed, this company should continue to accomplish other \_\_\_\_\_\_ duties. Refer to \_\_\_\_\_ \_\_\_\_\_\_\_\_\_\_\_ \_\_\_\_\_\_\_\_\_\_ on ventilation for details. It is preferable to utilize equipment off of the \_\_\_\_\_\_ \_\_\_\_\_\_\_. The officer shall inform the IC which truck company functions they will be performing.
Ventilation: three (3) truck Job Performance Standards attack engine
II. Five (5) Tactical Objectives:
D. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_: 1. The IC will assign \_\_\_\_\_\_\_ and \_\_\_\_\_\_ lines unless a fire attack \_\_\_\_\_\_\_ or \_\_\_\_\_\_\_ has been established. This then would be the responsibility of the group or division leader at the appropriate time. 2. The block line can be assigned to any crew with \_\_\_\_\_ or more personnel. This line should be positioned to stop the \_\_\_\_\_\_ of \_\_\_\_\_. This crew should carry a \_\_\_\_\_\_\_\_\_\_ and \_\_\_\_\_ \_\_\_\_\_ inside the structure. The \_\_\_\_\_\_\_\_ should then be breached and the line deployed into the?
Backup and Block Lines: backup and block group or division two (2) spread of fire ceiling attic or the floor above the fire
II. Five (5) Tactical Objectives:
Backup and Block Lines: 3. The backup line will protect \_\_\_\_\_\_ and \_\_\_\_\_ with fire attack.
egress and assist
II. Five (5) Tactical Objectives:
E. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_: 1. The IC will make a \_\_\_\_\_\_\_ assignment, if necessary. \_\_\_\_\_\_\_\_\_ should be \_\_\_\_\_ \_\_\_\_\_\_\_ from the incident or at another convenient location. 2. Staged companies may be called to the scene, utilized to lay a \_\_\_\_\_\_\_\_\_ supply line or chase \_\_\_\_\_\_\_ \_\_\_\_\_\_\_ in the area, etc. It is always preferable to stage an \_\_\_\_\_\_\_ company to accomplish the above task.
Staging Assigment: staging Staging one (1) block secondary flying brands engine
II. Five (5) Tactical Objectives:
A. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ B. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ C. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ D. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_ E. \_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_\_
A. Primary Search and Attack Line B. Water Supply C. Ventilation D. Backup and Block Lines E. Staging Assignment