what is the primary goal of work measurement?
to establish standard methods for work to be measured, gather standard data, and so that maintenance efficiencies can be measured against the standards
what is the most important method of work measurement?
standardization of work
equipment records must contain a list of the following
- Machine and parts specification numbers
- A breakdown history
- A preventive-maintenance history
- Maximum and minimum spare-parts record
to determine crew size the following must be considered
- safety of the job 2. physical limitations 3. urgency of the job
when doing work measurements what are the 3 parameters to keep in mind
- Whoever is doing the job must be properly trained and skilled 2. requires specific tasks 3. The environment must be safe and comfortable for the assigned work
what is generally good for performing time studies
the stopwatch method
why is it good to do time studies for repetitive and common maintenance tasks
it establishes standard data that can be used to tell what the average time to do that task is in writing.
what are the advantages of a time study
training of supervison to mangagment, tighter control maintenance work
what is statistical analysis good for in work measurement?
it determines the minimum cost to collect data for standards, and the minimum administrative control cost.
to complete a work sampling study you must do the following
- define what is to be measured 2. determine the “elements” 3. estimate the number of measurements required 4. outline a plan 5. train supervisors 6. do the measurement
Management should review work measurements when
both before and as projected in terms of cost projections