Corrective and predictive maintenance Flashcards
Tasks are shceduled occurs in for general plant activity
corrective maintenance
breakdown maintenance
tasks occurs when a machine or equipment fials
inspection occurs to gather data on when to do maintenance tasks
preventive maintenance
what two factors contribute to the high cost of breakdown maintenance
poor planning and incomplete repairs
what are the two limitations of breakdown maintenance
- it is poorly planned due to time constraints. 2. it only focuses on the equipment on hand not the root cause
what equipment to inspect in preventive maintenance
equipment that is vital to production, material handling, and safety.
what is the frequency of preventive maintenance based on
past data
what is the order of corrective maintenance
preventive maintenance occurs, detect an issue if it is a fast issue fix onsite if not create a work order.
what is a huge advantage of predictive maintenance e
properly used, it can eliminate all major factors that limit plant performance
how many manufacturers saw a reduction in total repair time after implementing predictive maintenance programs
91 %
what are ways that predictive maintenance detects when equipment needs to be repaired
oil, acoustic, vibration, and infrared imagery analysis