WIND POWER Flashcards

1
Q

In an aerogenerator exceeding 100 kw capacity, which part is responsible in converting rotational movement to electricity?

A. Rotor B. Turbine C. Alternator D. Governor

A

C. ALTERNATOR

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  1. What component of force is used in multi-bladed windmills?

A. Lift force B. Drag force C. Side force D. Drop force

A

A. LIFT FORCE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  1. What component of force is used in savonius windmills?

A. Lift force B. Drag force C. Side force D. Drop force

A

B. DRAG FORCE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  1. The type of pump is appropriate for multi-bladed windmills.

A. Hydraulic B. Pneumatic C. Reciprocating D. Diaphragm

A

C. RECIPROCATING

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  1. While the windmill is in operation, what efficiency can exceed 100%?

A. Volumetric B. Transmission C. Rotor D. All of the above

A

A. VOLUMETRIC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  1. What wind energy resource is located about 10-16 km from Earth surface with velocity over 150 kph?

A. Terrestrial wind B. Extra-terrestrial wind C. Jet stream D. High wind

A

C. JET STREAM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  1. What tail type of multi-bladed windpump is more effective for windy areas?

A. Hinged side vane B. Ecliptic C. Manual folding D. No tail

A

A. HINGED SIDE VANE

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

In multi-bladed windpumps, which part is responsible in converting rotational movement to reciprocating action?

A. Rotor B. Connecting rod C. Reciprocating pump D. Crank arm

A

B. CONNECTING ROD

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

In wind farm development, which should be done first?

A. Rotor
B. Energy demand survey
C. Transmission D. Wind velocity measurement

A

D. WIND VELOCITY MEASUREMENT

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

In multi-bladed windpump manufacturing, which should be done first?

A. Rotor blade B. Rotor frame C. Tower D. Jig

A

D. JIG

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

To have bigger water displacement volume in windpumps, which should be increased?

A. Connecting rod length B. Rotor diameter C. Crank arm D. Well diameter

A

C. CRANK ARM

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

In windmill design, what should be the average rotor blade twist angle in degrees to have a tip speed ratio of
1:1?

A. 30 B. 45 C. 60 D. 75

A

B. 45

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

if typical overall efficiency of savonius windmills is 7-10%, what is the typical overall efficiency of
aerogenerators?

A. 7-10% B. 15-17% C. 18-21% D. 90-95%

A

D. 90-95%

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

If a multi-bladed windpump has a tip-speed ratio of 1:1, what windspeed is needed to have its rotor tip move at
3.2 m/s?

A. 1 m/s
B. 3 m/s
C. 1 ft/s
D. 3 ft/s

A

B. 3 m/s
Windspeed = tip speed, since tip-speed ratio is 1:1
= 3.2 m/s

How well did you know this?
1
Not at all
2
3
4
5
Perfectly