Weapons Assembly Flashcards
The plastic shipping plugs are removed from the nose well and the tail fuze cavity of MK 80 GP bombs at which of the following times
During depalletizing procedures
What is the indication of the FMU-139 series fuze when the saving pin is removed and the red and black striping is visible on the gag rod sleeve
Fuze is enabled and could be armed
What is the proper orientation of an MK 122 arming safety switch coaxial cable when installed in the BLU-110
All answers are correct
A. Left angle to the lugs
B. Forward of the lanyard
C. 45 degree angles to the lugs
When tightening the clamp bolt of the BSU-33 fin to the bomb body what must you ensure
The fin clamping ring contacts within V-groove of bomb body 360 degrees
What component retains the firing pin assembly of the MK 76 practice bomb
A cotter pin
Where is the MK 89 spotting charge adapter installed in the BDU-45
Bomb tail well
What is the acronym GBU
Guided bomb unit
What is the first inspection step you must perform on the MXU-667 AFG once you have removed it from its container
Verify safety pins and streamers are installed in latch release lever and collar of wing assembly
What must you care about when exercising the PRF switches on the MAU-169 , MAU-209 , and WCU-10
That switch stop limits are not exceeded
A complete JDAM guidance set consists of a tail assembly and _______ assembly
Aero surface
When inspecting the CBU-99 fin release band for installation of safety cotter pin what must you ensure
Safety cotter pin prong is bent to 15-30- degree angle
Before a reusable rocket launcher is loaded onto an aircraft , it should be sent to AIMD for which of the following reasons
An electrical checkout
When a rocket warhead is inspected , what maximum amount of gap , if any , is allowed between the fuze adapter and the warhead
No gap is allowed
Which of the following devices should be in place whenever a rocket motor is removed or protrudes from a rocket launcher
A shielding band
When inspecting the SLAM-ER in the shipping container , you must inspect the interior for any evidence of damage , engine oil , fuel , ______or _______
Battery electrolyte , loose hardware
What primary factor dictates the way a weapon is to be configured
The mission requirements
what provides detailed information for weapons uncanning/recanning and inspection , component unpackaging/inspection , repackaging and weapons assembly , and inspection criteria for assembled weapons
airborne weapons assembly manual (WAM)
regardless of how well trained an assembly crew may be , there must always be a team leader (TL) , a quality assurance (QA) inspector and what other member
safety observer (SO)
the designated bomb assembly areas on the amphibious assault ship (general purpose) (LHA) and the multi-purpose amphibious assault ships (LHD) class is normally located on what deck (aviation ordnance/bomb assembly magazine) or other designated assembly areas depending on the class of ship
5th
what is the term used to define the physical removal of ammunition from the magazine
breakout
weapons are broken out , by direction of whom , in accordance with the load plan
Ordnance Handling Officer (OHO)
bombs , with more than 56 square inches of thermally protected , and are restricted from use afloat
15
the navy currently used what series of electronic bomb fuze
FMU-139
when stored in original shipping/storage container , the shelf life of BSU-85 fins is how many years
20
unless the BSU-86 fin is used on MK 82/BLU-111 live loaded tactical Depth bomb , ensure that the eight set crews are made of what
steel
the practice bombs normally used on a routine basis are the MK 76 Mod 5 and what else
BDU-48
don’t make changes or additions to any ordnance or ordnance components without explicit authority from the what
Naval Air Systems Command