Water Supply Flashcards
The first arriving engine officer to a structure fire is responsible for what?
Securing a water supply or assigning it to another engine
What should second third and fourth due engines do on arrival to structure fire?
Level 1 stage on a hydrant
Hose lays greater than how many feet should be reported to incident command?
600 ft
Who can be a Water Supply Group supervisor?
Any engine officer or chief officer on scene
What are 6 possible reasons why first arriving engine officer may use tank water instead of laying in to hydrant?
Confirmed rescue
Exact location not obvious
Unknown best engine placement
Driver can back stretch
Best hydrant not in travel path
Don’t block 1st due truck
What are the max number of lines you can operate with a booster tank?
- 1-3/4”
- 2-1/2
Pump operators should not allow their intake pressure to drop below what?
20 PSI
What color are high pressure hydrants painted?
Blue
What is a possible sign of a low pressure low flow hydrant?
Maybe marked with a black bonnet
What size hose should you use for water supply?
3 inch or larger
For fires in commercial buildings, companies are expected to lay in what header?
Double
When should a 2nd engine park at hydrant and relay pump?
There is 300’ or more of hose between 1st engine and hydrant
What is the target GPM of headers?
Single 700gpm
Double 1400gpm
Achieved with lays <300’ normal hydrant pressure