Vol 1 Flashcards

1
Q

Problems include System loop that cause pointer problems, Lost audit trails, and incorrect accountable record updating, normally corrected immediately

A

Code one major impact

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

These type of problems stop the computer from processing input, but do not cause looping nor do they destroy accountable records. Problems are corrected next release to be shipped.

A

Code two severe problem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

This problem does not stop processing, it might be spacing or incorrect rejects that are really encountered. Problems are corrected in next scheduled release

A

Code 3 chronic problem

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

These are misspelled words and other minor program deficiencies they are corrected as workload permits

A

Code four cosmetic error

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

How often are surveillance visit to our material functions except fuels scheduled?

A

Annually

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the basic ground rules when conducting a surveillance visit?

A

Check in with flight chief. Do you not bypass supervisor. Do you not tour alone have flight chief or supervisor with you. I think confidence. Checked out with flight chief. Prepare a written report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What form is submitted when the supply computer does not process or update transactions as it should and to whom is the form submitted?

A

Air Force form 1815; direp monitor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Who is responsible for submitting, controlling, and monitoring DIREPS?

A

QA activity

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Who are the DIREP team members?

A

User, ADP supply system Monitors, DIREP monitor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What products are used to conduct a surveillance visit and who develops them?

A

Checklist; MAJCOM or base

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Why is the review of management products coordinated with the quality assurance element?

A

To avoid duplication in identifying problems and determining training requirements

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When can your unit expect a report on discrepancies?

A

Within five working days after the exit briefing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

With and what time frame are the replies to a surveillance report due

A

Within 15 work days of the date of report

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

How long should a special interest item last

A

Six months or less

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Who reviewed and validates all proposed changes and suggestions?

A

Q a personnel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Who will select highly experienced material management personnel to become shop oriented customer assistance teams

A

LRS\CC

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

What information is provided to LRS leadership through the QA program?

A

Assessment of unit ability to perform key logistics processes, while promoting a culture of professional excellence and personal responsibility

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
18
Q

What is the purpose of the analysis function within QA?

A

Controlling function designed to analyze the operation of the material management system and show the effectiveness of the account

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
19
Q

What purpose does the SDR and ROD serve?

A

Identify to the appropriate managers adverse trends that require corrective action

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
20
Q

What four elements are included in the analysis program

A

Development, section, analysis, presentation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
21
Q

What does it effective QA analysis include?

A

Includes trends, comparisons of performance with prescribe standards, recommendations of corrective action, and briefings

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
22
Q

What are the three methods of analysis?

A

Trend analysis, problem analysis, special studies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
23
Q

What type of analysis does the anulus conduct when he or she compares the statistical data of the account to an official file of factors, standards, and norms?

A

Trend analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
24
Q

What type of analysis is normally used for clothes review of a specific activity to determine if there are any problems or potential problem?

A

Special studies

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
25
Q

Defined the term management indicator

A

Performed measures that represent a Key result

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
26
Q

Where’s a good place to begin gathering data for the account after determining which management and the kiddos will be used?

A

D14 and M32

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
27
Q

What purpose does identifying deviations and deficiencies serve?

A

To highlight how significant problems or trends are impacting on an account

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
28
Q

When conducting an analysis, how was collected data used to identify deficiencies that may exist?

A

They will help determine if areas deviate from the norm or excepted standard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
29
Q

What type of analysis can and in most cases will identify a problem before it gets out of hand?

A

Continuing analysis

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
30
Q

What indicator may become unfavorable when MACRS are set to low?

A

Low issue/stockage effectiveness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
31
Q

What indicator maybe come on favorable when weekly walk-throughs are not accomplished and assets are not a red flag when the fall at or below 50%?

A

Low bench stock effectiveness

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
32
Q

What are the purposes of the ROS program?

A

Research and investigate cause of loss damages
Excess liability against those who have lost or damaged property
Provide documentation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
33
Q

What form is used to process an ROS

A

DD form 200

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
34
Q

What provides the basics source and or support documents for property adjustments and inventory account records?

A

Discrepancy report

35
Q

When are overages or shortages required to be reported?

A

When value is greater than $100 except control items which will be reported regardless of dollar value

36
Q

When would a discrepancy report not be Submitted?

A

When the discrepancy has nothing to do with the actual part

37
Q

With and what time standard Musta receiving activity submit an SDR For shortage of a controlled item?

A

Within 24 hours of discovery

38
Q

What happens to the suspense file copy of an SDR when it’s reply is received?

A

Copy is destroyed

39
Q

When is the second follow-up sent to an action or activity that has not replied to an SDR?

A

45 days after the first follow-up

40
Q

Where are copies of all SDR replies forwarded to you?

A

A and F

41
Q

What is the ADRSS?

A

Automated data report submission system, sends and receives data on base

42
Q

What is the primary goal of SIFS?

A

Dispatch they damages generated by the material management system application programs

43
Q

What capability do the SIFS use your files provide a user?

A

Capability to redirect Specific TRIC or program images to a file of their choice

44
Q

Why is it important for the SIFS user files to be managed?

A

Understanding that flat files can be easily lost, destroyed, or corrected

45
Q

What are SIFS residue files designed to ensure?

A

That any in or outbound images that could be identified or dispatched are cleared in a timely manner

46
Q

When our SIF as residue files created?

A

Went to corresponding SIFS control record cannot be found

47
Q

What section is responsible for ensuring all SIFS resident images are cleared as soon as possible?

A

LGLOS

48
Q

What does the narrative file contain?

A

Message packets of a DLATS rejects that are returned to the material management system account for correction and resubmission

49
Q

What will happen if an attempt is made it to edit the narrative file and how can someone use the narrative file?

A

Corruption and cause the ADRSS to lock and abort SIFS monitor must catalog a material management system work file and then copy the narrative file into it

50
Q

Superintendent Bare base support. Provides person now for Aer a mobility command strategic, tanker , and tactical supply support

A

JFBBS

51
Q

Superintendent customer support package. Provides manual or automatic control of audible documents through the Air Force equipment management systems which permits loading, changing, or deleting equipment authorizations

A

JFBCS

52
Q

Superintendent mobility support. Provide mobility support expeditionary theater distribution center augmentation to the combat supply activity at main operating base, FOS, CLS.

A

JFBCW

53
Q

Initial supply bed down package. Provide supply expertise during initial supply bed down at MOB, FOS, CSL

A

JFBFM

54
Q

Superintendent hazardous material management. Provides inventory management capabilities (Receipts, storage, issue, requisition, inspection, shipment disposal, and tracking) for the control of hazardous material.

A

JFBHM

55
Q

Superintendent material management equipment. Provide material management support to accountable officers, responsible officers, and responsible person, and control and accountability of a class 9 and class eight.

A

JFBME

56
Q

Material control. Augments material management function at any level and can be deployed to any location under any environment worldwide.

A

JFBMM

57
Q

Material storage activity and readiness spare packages. Manually or using the material management system, I LSS, provides the capability to manage 5000 line items in the warehouse.

A

JFBMS

58
Q

Super intendant repair cycle management. Provide operations support to the combat supply activity at MOB, FLS, or CSL. Weather manually or using the material Management system, I LSS, it provides the capability to control, process, evaluate class 9 DIFM.

A

JFBRC

59
Q

The LRS is divided into word for functional flights?

A

Deployment and distribution, material management, vehicle management, and fuels management

60
Q

Who is the next officer and overseas sophisticated and diverse day-to-day operations within the squadron?

A

Operations officer

61
Q

What flight is responsible for centralized command and control, planning and execution of all we deployment operations and the distribution of cargo, personnel, and personal property?

A

Deployment and distribution flight

62
Q

What provides a unique framework that links performance metrics, processes, best practices, and people into unified structure?

A

SCOR

63
Q

What is the ability to track the identity, status, and location of DOD units, and non unit cargo, and passengers from origin to consignee or Destination across the range of military operations?

A

In transit visibility (ITV)

64
Q

What is a web based automated command and control information system that supports transportation users and providers by providing an integrated system of ITV information in command and control capabilities?

A

Global transportation network (GTN)

65
Q

What is designed to efficiently collect, process, and transmit transportation data?

A

Cargo movement operation system (CMOS)

66
Q

What is an AMC air transportation system that supports fixed, deployed, and mobile sites.

A

Global air transportation execution system (GATES)

67
Q

What AMCs force level C2 system that supports the TACC execution authority for affective airlift mission management?

A

Global decision support system (GDSS)

68
Q

AFMC has developed what, an Internet website that provides users with information from his data warehouse, which is filled by numerous data systems used by the DOD?

A

Tracker

69
Q

What is used to manage, Track, and report hazardous material usage by ensuring only authorized personnel are allowed to order and receive hazardous material?

A

Enterprise environmental safety and occupational health management information system (EESOH – MIS)

70
Q

Which record retrieval code is used to obtain inquiry and put on the repair cycle data?

A

Record retrieval code 5

71
Q

What does be entered in the releveling flag field of the item record retrieval input to request the requirements computation of a given stock number?

A

Releveling flag R

72
Q

What is reflected in the cumulative rejects expense summary totals they provide the key to determine whether rejects are being reprocessed or deleted promptly?

A

Reject time frames

73
Q

Who may force delete rejects using the reject processor program?

A

Reject monitor

74
Q

What listing shows all the rejects cleared by the monitor and is sent to each flight for review?

A

D20

75
Q

Which supply management listing reflects all accountable rejects and the number of times reprocessing was attempted for each reject?

A

D818

76
Q

What provides a unique framework that links performance, metrics, processes, best practices, and people into a unified structure?

A

Supply chain operations reference

77
Q

When does the material management in listed vareer broadening program select panel that is chaired by the 2S career field manager?

A

May June

78
Q

How many NCO’s per year are assigned to each Air Force material come in early just a complex?

A

Three

79
Q

An effective analysis program must be based on what?

A

Organizational objectives

80
Q

Which type of items does quality assurance determine it requires to perform an analysis during its review of all trend factors on specific subjects?

A

Statistics and source documents

81
Q

Items such as stock affectedness, MICAP, priority due out, warehouse refusal, inventory accuracy, percentage of base repair, and record reversal are examples of what?

A

Management indicators

82
Q

In addition to management reports, what other sources of information can help in identifying problems when gathering data after other indicators have been selected?

A

Training reports

83
Q

How many days after the initial submission of the supply discrepancy report with the discrepancy details appear on the SDR listing?

A

55 to 109

84
Q

After how many days will the SIFS residue images be deleted?

A

10 days