Unit 8: Flashcards

1
Q

________ is a philosophy of operation that strives to maximize efficiency by simplifying production processes and eliminating waste.

A

Just-in-time

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

True or false? The pull system involves moving materials based on actual needs at successive work centers, while the push system moves materials based on a preplanned schedule.

A

True. A pull system moves materials based on actual needs at successive work centers. A push system moves materials through the processing operations based on a schedule.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

is a method of analyzing the flow of materials, ideas, and information to understand how processes function.

A

Value Stream Mapping

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

True or false? Set-up time refers to the time required to readjust a machine to make one part after using the machine to make another part.

A

True. Set-up time is the time it takes to readjust a machine or group of machines after making one particular part until acceptable units of another part are produced. Set-up time may involve changing the tooling, adjusting the equipment, checking that the new part is being made to specifications, and then readjusting the equipment if it is not.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

True or false? The single-card kanban allows more extensive control over production and inventory than the dual-card kanban system.

A

False. The major advantage of the dual-card kanban system over the single-card kanban is that it allows greater control over production, as well as over inventory, because both production and withdrawal of inventory are directly connected to need. In contrast, a single-card system bases production on a plan, which may lead to excess inventory if actual need does not match the plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

True or false? In a JIT environment, the master schedule is primarily only used when a firm must order items that have long lead times.

A

True. The master schedule is used in a JIT environment only when items with long lead times must be ordered. Thus, in a JIT system, the master schedule is primarily an intermediate step in reaching the final assembly schedule.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

For a JIT firm to function efficiently, inventory levels should be kept

A

Low

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

When a customer is not being served or a good is not being processed, what type of waste is occurring?

A

waiting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

A JIT firm that wants to gain a competitive advantage should most likely ________.

A

reduce process variability

How well did you know this?
1
Not at all
2
3
4
5
Perfectly