Unit 6: Forecasting, Scheduling, and Planning Systems Flashcards

1
Q

is an attempt to predict the future by studying past experiences for the purpose of gaining insights.

A

Forecasting

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

A ___ helps analyze operating problems by identifying key variables and relationships to improve understanding.

A

Model

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

refers to demand that is generated by a firm’s production processes.

A

dependent demand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

elicit information from specific groups, such as consumers, and are usually conducted via a questionnaire or a phone interview.

A

survey

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

The ________ method uses only the most recent time period to project the next time period, and each time period has the same weight.

A

simple moving average

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

True or false? Mean squared error (MSE) is calculated by subtracting a forecast for one time period from the actual value for the same time period.

A

False. Forecasting error can be calculated by subtracting the forecast for one time period from the actual value for the same time period. However, mean squared error (MSE) is the average of all squared errors.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

When planning takes place for a time period of 6 to 18 months, it is best described as ________ operations planning.

A

medium-range

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Which of the following involves combining individual end-items into groups for planning purposes?

A

Aggregate planning

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Which of the following is based on the aggregate plan and is designed to specify exactly what will be produced and when it will be produced?

A

Master production schedule

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

True or false? In a master production schedule, time buckets serve as boundaries between periods in the planning horizon. As a result, items that fall outside of the time bucket are not included in the plan.

A

False. Time fences, not time buckets, act as boundaries between periods in the planning horizon and represent the limits for planning. Items falling outside the time fence are not included in the plan.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

True or false? Demand from customers is a type of independent demand, while demand from a firm’s production processes is a type of dependent demand.

A

True. Independent demand is demand that is not controlled directly by the company, such as demand from customers. Dependent demand is usually demand for an item that is generated by a company’s production process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Which of the following provides details about a product’s components and structure?

A

Bill of Materials

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

True or false? If a service firm develops a schedule according to chase demand, the firm will have enough capacity available at all times to meet maximum expected demand.

A

False. Peak demand, not chase demand, means that sufficient capacity will be available at any time to meet the peak expected demand.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

King Burgers schedules more workers on busy weekends and fewer workers on slower week days. King Burgers bases its schedule on ________.

A

chase demand

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

In a manufacturing environment that uses a(n) ________, the main scheduling dilemma stems from knowing the best time to switch from making one product to making another product.

A

continuous flow process

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

On an assembly line, assigning the same amount of work to each workstation and having the appropriate number and type of workstations is necessary to achieve ________.

A

balance

17
Q

________, which is based on current usage rates, helps determine which product to manufacture next.

A

Run-out time

18
Q

MRP II was an improved version of MRP that provided manufacturers with the ability to ________ .

A

integrate data from non-manufacturing departments