U5 Quantification Flashcards
What are the three rules of measurement?
NRM1
Order of cost estimating & cost planning
NRM 2
Construction quantities & works procurement
NRM3
Maintenance, Operation cost planning
What are the QS’s action in relation to the RIBA work stages? (7)
PREPARATION & BRIEF
Functional or element estimate
CONCEPT DESIGN
Elemental cost estimate
DEVELOPED DESIGN
Cost plan
TECHNICAL DESIGN
Cost checks against bill of quantities
CONSTRUCTION
Agreement of variations & payment
HANDOVER
Any claims & final account.
USE
Evaluation
List the five forms of dimension paper?
Cubic
Square measurements
Linear measurement
Enumerated items
Items
List the dimension paper structure? (4)
Timesing
Dimension
Squaring
Description
Explain the following terms
Timesing
Dotting on
Waste calcs
TIMESING
Where an item has several of the same measurements, it can be indicated as multiplied.
DOTTING ON
Where a measurement cannot be multiplied but can be added
WASTE CALCS
Written on top write before item description.
Explain the following terms
ADDING ON
DEDUCTIONS
BRACKETS
ADDING ON
Where two or more descriptions are applied to the one measurement.
DEDUCTIONS
Where a deduction is to be made it is provided by “deduct”
BRACKETS
Applied along the length of a measurement that they apply to.
How is the centre line of a wall measured?
Twice of half of the wall thickness is added to the internal perimeter for each external corner.
Why do we need a standard method of measurement?
Recognised order, sequence and agreed rules.
What are the three current conventions?
GROUP
TRADES
SCOTTISH TRADE SYSTEM
What are the various stages in relation to the RIBA work stages?
Preparation & Brief
Concept
Developed
Technical
Construction
Handover
Use