Q
  • TRM 3.1.2.1 Charging Pumps / Flow Paths - S/D*
    • *

When is TRM 3.1.2.1 Charging Pumps / Flow Paths - Shutdown Applicable?

A

MODE 4

MODE 5 w/ Loops filled

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • TRM 3.1.2.1 Charging Pumps / Flow Paths - S/D*
    • *

What are your ≤ 1 hr action(s) if no boron injection flowpaths are available, or all CCPs inoperable, or all emergency power sources are inoperable while in MODE 4 or MODE 5 w/ loops filled?

A
  • TRM 3.1.2.1 Charging Pumps / Flow Paths - S/D*
  • Action A*
    • *

Suspend all Positive Reactivity Additions that could result in a loss of SDM or boron concentration [Immediately]

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • TRM 3.1.2.1 Charging Pumps / Flow Paths - S/D*
    • *

What are the boron injection flowpaths required in MODE 4 or MODE 5 with RCS loops filled?

A
  • Method 1:*
  • *BAT**
  • Pump or Gravity Feed*
  • *CCP**

Method 2:
RWST
CCP

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • TRM 3.1.2.2 Charging Pumps / Flow Paths - Operating*
    • *

When is TRM 3.1.2.2 Charging Pumps / Flow Paths - Operating Applicable?

A

MODES 1-3

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q
  • TRM 3.1.2.5 Borated Water Sources - Shutdown*
    • *

What borated sources of water must be available in MODE 5-6?

A

BAT:
≥ 3200 gal
≥ 7000 ppm Boron
≥ 65 ˚F

RWST:
MODE 5: 122,000 gal
MODE 6: 33,000 gal
2800 ppm - 3000 ppm Boron

Need one of the above.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • TRM 3.1.2.5 Borated Water Sources - Shutdown*
    • *

What are your ≤ 1 hr action(s) if no borated water sources are FUNCTIONAL in MODES 5-6?

A
  • TRM 3.1.2.5 Borated Water Sources - Shutdown*
  • Action A*
    • *
  • Suspend all operations involving Core Alterations [Immediately]

AND

  • Suspend positive reactivity additions that can reduce SDM or boron concentration [Immediately]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • TRM 3.1.2.6 Borated Water Sources - Operating*
    • *

What borated sources of water must be available in MODE 1-4?

A

BAT:
≥ 27,000 gal
≥ 7000 ppm Boron
≥ 65 ˚F

RWST:
≥ 458,000 gal
2800 ppm - 3000 ppm

  • Need both for MODES 1-3
  • Need 1 for MODE 4
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • TRM 3.1.2.6 Borated Water Sources - Operating*
    • *

What are your ≤ 1 hr action(s) if the Boric acid storage system is lost in MODES 1-4 and is being used as one of the boric acid sources?

A
  • TRM 3.1.2.6 Borated Water Sources - Operating*
  • Action A*
    • *
  • Initiate CR to return to FUNCTIONAL status [Immediately]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • TRM 3.1.2.7 Boron Injection System - Shutdown*
    • *

When is TRM 3.1.2.7 Boron Injection System - Shutdown Applicable?

A

MODE 5 w/ RCS loops not filled

MODE 6

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • TRM 3.1.2.7 Boron Injection System - Shutdown*
    • *

What are your ≤ 1 hr action(s) if you have no CCP or LHSI pumps capable of taking suction on the RWST or BAT during MODE 5 w/ RCS loops not filled or MODE 6?

A
  • TRM 3.1.2.7 Boron Injection System - Shutdown*
  • Action A*
    • *
  • Suspend Positive Reactivity additions that could result in loss of SDM [Immediately]

AND

  • Suspend all operations that could drain down the Rx Cavity [Immediately]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q
  • TRM 3.1.3.3 DRPI - Shutdown*
    • *

What are your ≤ 1 hr action(s) if DRPI indication is lost in MODES 3-5 with the Rx Trip breakers shut and Rod control capable of withdrawing rods?

A
  • TRM 3.1.3.3 DRPI - Shutdown*
  • Action A*
    • *
  • Open the Rx Trip Breakers [Immediately]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • TRM 3.4.2.1 Safety Valves - Shutdown*
    • *

What are your ≤ 1 hr action(s) if all PZR safety valves are nonfunctional in MODES 4-5?

A
  • TRM 3.4.2.1 Safety Valves - Shutdown*
  • Action A*
    • *
  • Suspend operations that involve positive reactivity additions that could result in loss of SDM

AND

  • Place OPERABLE RHR train in shutdown cooling
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • TRM 3.4.9.2 PZR Temperature Limits*
    • *

What is the PZR HUR, CDR, and Aux Spray ∆T Limits?

A

HUR: 100 ˚F/hr

CDR: 200 ˚F/hr

Aux Spray ∆T: 621 ˚F

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q
  • TRM 3.4.9.2 PZR Temperature Limits*
    • *

What are your ≤ 1 hr action(s) if you violate the PZR HUR, CDR, or PZR spray max ∆T?

A
  • TRM 3.4.9.2 PZR Temperature Limits*
  • Action A*
    • *
  • Restore temperature to within limits [30 mins]

AND

  • Do an engineering evaluation and to determine if PZR is still acceptable for continued operation [6 hrs]

OR

  • Be in MODE 3 [6 hrs]

AND

  • Reduce PZR pressure to < 500 psig [Following 30 hrs]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • TRM 3.4.11 Rx Vessel Head Vents*
    • *

When is TRM 3.4.11 Rx Vessel Head Vents Applicable?

A

MODES 1-4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q
  • TRM 3.4.11 Rx Vessel Head Vents*
    • *

What are the ≤ 1 hr action(s) if ≥ 1 Rx head vent valves are nonfunctional in MODES 1-4?

A
  • TRM 3.4.11 Rx Vessel Head Vents*
  • Action A*
    • *
  • Restore Rx head vent to functional status [Immediately]
    • *

Note:
Continued S/U / Power operation may continue if valves in vent path are closed with power removed.

17
Q
  • TRM 3.6.2.1 Containment Spray System*
    • *

When is TRM 3.6.2.1 Containment Spray System Applicable?

A

MODES 1-4

18
Q
  • TRM 3.6.4.1 Hydrogen Analyzers*
    • *

When is TRM 3.6.4.1 Hydrogen Analyzers Applicable?

A

MODES 1-2

Only action is if ≥ 1 Hydrogen Analyzers nonfunctional, get it back as soon as practical.