Section 3.3 Instrumentation Flashcards
- LCO 3.3.1 Rx Trip Instrumentation*
- *
If the plant is in MODES 3-5 and we lose 1 or both extended range NIs, what are our actions?

- LCO 3.3.1 Rx Trip Instrumentation*
- Action 5*
- *
Loss of 1 Extended Range:
- Restore to OPERABLE [72 hrs]
OR
- Suspend all positive reactivity changes [Immediately]
Loss of Both Extended Ranges:
- Suspend all positive reactivity changes [Immediately]
AND
- Isolate unborated water sources [15 min]
AND
- Restore to OPERABLE [1 hr]
OR
- Secure unborated water sources [2 hrs]
AND
- Verify SDM [4 hrs] and every 12 hrs

- LCO 3.3.2 ESF Instrumentation*
- *
If the charging header pressure indicator (PT-0204) fails while in MODES 1-4, what are your actions?

- LCO 3.3.2 ESF Instrumentation*
- Action 16*
- *
- Place in trip [1 hr]
AND
- Restore to OPERABLE [7 days]
OR
- Be in MODE 3 [6 hrs]
AND
- Be in MODE 5 [Following 30 hrs]

- LCO 3.3.5 Remote Shutdown Room*
- *
When is LCO 3.3.5 Remote Shutdown Room Applicable?

MODES 1-3

Bases:
Allows operators to maintain plant in safe shutdown (MODE 3) from a location other than the control room.
- LCO 3.3.1 Rx Trip Instrumentation*
- *
If the plant is in MODES 1-2 and we lose 1 Intermediate range NI, what are our actions?

- LCO 3.3.1 Rx Trip Instrumentation*
- Action 3*
- *
Below P-6:
- Restore to OPERABLE before exceeding P-6
Above P-6 but below P-10:
- Restore to OPERABLE before exceeding P-10

- LCO 3.3.1 RTS Instrumentation*
- *
Can the CRMP be applied to anything in LCO 3.3.1 RTS Instrumentation?
No
Most actions involve placing channel in bypass and then placing in trip within 72 hrs.
Note:
LCO 3.3.2 ESFAS Instrumentation: The CRMP can be applied to most things and if it cannot be applied then Be in MODE 3 [6 hrs] and MODE 5 [Following 30 hrs]
- LCO 3.3.6 Post Accident Monitoring*
- *
When is LCO 3.3.6 Post Accident Monitoring Applicable?

MODES 1-3

Most actions are fix within 30 days and submit a report in 14 days.
- LCO 3.3.6 Post Accident Monitoring Instrumentation*
- *
How many sensors can fail in a RVWL probe and RVWL still be OPERABLE?
- *Probe consists of 8 sensors
- 2 in the top / 6 in the bottom***
Need ≥ 1 in the top OPERABLE
AND
Need ≥ 3 in the bottom OPERABLE

- LCO 3.3.1 Rx Trip Instrumentation*
- *
If the plant is in MODE 2 and we lose 1 source range NI, what are our actions?

- LCO 3.3.1 Rx Trip Instrumentation*
- Action 4*
- *
- Suspend Positive Reactivity Additions [Immediately]
- *
Limited Cooldown and dilution is allowed if accounted for in SDM
