Section 3.1 Reactivity Control Systems Flashcards

1
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

When is LCO 3.1.3.1 Movable Control Assemblies Applicable?

A

MODES 1 and 2

All S/D and Control Banks shall be OPERABLE AND within ± 12 steps of their group step counter demand position.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q
  • LCO 3.1.1.1 SDM*
    • *

What is the definition of SDM?

A

Amount of reactivity by which the Rx is subcritical or would be subcritical assuming all full-length RCCA’s (S/D and Control) are fully inserted w/ highest reactivity RCCA stuck at top of core.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q
  • LCO 3.1.1.1 SDM*
    • *

What is the bases for the different regions of the SDM curve in the COLR?

A

Constant SDM Region (1.3 % ∆p)

Protect against uncontrolled C/D from SLB

Variable SDM Region

Protect against boron dilution accident

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q
  • LCO 3.1.1.1 SDM*
    • *

When must SDM be verified prior to criticality?

A

MODE 2 w/ keff < 1

Within 4 hrs prior to criticality

Also performed prior to operations > 5% RTP after refueling.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

LCO 3.1.1.3 MTC

What is the limit for negative MTC at core EOL?

A

-62.6 pcm / ˚F

It cannot be positve at 100% at EOL

Note:
No limit at BOL

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

What are your ≤ 1 hour action(s) if > 1 rod is trippable but inoperable due to something other than being immovable due to friction / mechanical interference?

A
  • LCO 3.1.3.1 Movable Control Assemblies*
  • Action D*
    • *

Power Operation may continue provided that:

  • Remainder of Rods in group aligned to within ± 12 steps on group counter while maintaining rod sequence and insertion limits of COLR [1 hr]
  • Thermal power restricted per LCO 3.1.3.6 Control Rod Insertion Limits [1 hr]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q
  • LCO 3.1.3.2 Position Indication Systems - Operating*
    • *

When is LCO 3.1.3.2 Position Indication Systems - Operating Applicable?

A

MODES 1-2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

What are your ≤ 1 hour action(s) if 1 rod is trippable but inoperable due to something other than being immovable due to friction / mechanical interference OR > ± 12 steps from it’s group counter?

A
  • LCO 3.1.3.1 Movable Control Assemblies*
  • Action B*
    • *

Power Operation may continue provided:

  • Rod restored to OPERABLE status [1 hr]

OR

  • Rod declared INOPERABLE [1 hr]
  • Remainder of Rods in group aligned to within ± 12 steps on group counter while maintaining rod sequence and insertion limits of COLR [1 hr]
  • Thermal power restricted per LCO 3.1.3.6 Control Rod Insertion Limits [1 hr]

OR

  • Rod declared inoperable [1 hr]
  • Verify SDM [1 hr]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q
  • LCO 3.1.3.6 Control Rod Insertion Limits*
    • *

When is LCO 3.1.3.6 Control Rod Insertion Limits Applicable?

A

MODES 1-2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q
  • LCO 3.1.3 Movable Control Assemblies*
    • *

What are the bases for LCO 3.1.3 Movable Control Assembly Section Specifications?

A

Ensures that acceptable power distribution limits are maintained.

Ensures that the minimum SDM is maintained

Ensures potential effects of rod misalignment on associated accident analysis are limited

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

LCO 3.1.1.4 Minimum Temperature for Criticality

What are your ≤ 1 hour action(s) if any loop’s Tavg < 561 ˚F?

A
  • LCO 3.1.1.4 Minimum Temperature for Criticality*
  • Action A*
    • *
  • Restore Tavg ≥ 561 ˚F [15 mins]

OR

  • Be in MODE 3 [15 mins]
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q
  • LCO 3.1.3.4 Rod Drop Time*
    • *

What are the entry conditions for LCO 3.1.3.4 Rod Drop Time?

A

Tavg ≥ 561 ˚F

All RCPs running

Rod drop time should be ≤ 2.8 secs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q
  • LCO 3.1.1.1 SDM*
    • *

When is LCO 3.1.1.1 SDM Applicable?

A

MODES 1 - 5

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

LCO 3.1.1.4 Minimum Temperature for Criticality

When is LCO 3.1.1.4 Minimum Temperature for Criticality Applicable?

A

MODES 1-2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q
  • LCO 3.1.1.1 SDM*
    • *

While in MODES 3-5, SDM must be evaluted once per 24 hrs. Which factors must be taken into consideration?

A

RCS Boron Concentration

Xenon Concentration

RCCA position

Tavg

Fuel Burnup

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

LCO 3.1.1.4 Minimum Temperature for Criticality

What is the bases for the Minimum Temperature of Criticality?

A

MTC is within its analyzed temperature range

The trip instrumentation is within its normal operating range

The PZR is capable of being in an OPERABLE status with a steam bubble

The reactor vessel is above its minimum RTNDT

17
Q
  • LCO 3.1.3.5 S/D Rod Insertion Limit*
    • *

When is LCO 3.1.3.5 Shutdown Rod Insertion Limit Applicable?

A

MODES 1-2

18
Q
  • LCO 3.1.1.1 SDM*
    • *

What are your ≤ 1 hour action(s) if SDM is not within the limits specified in the COLR?

A
  • LCO 3.1.1.1 SDM*
  • Action A*
    • *

Initiate Boration to restore SDM [15 min]

19
Q
  • LCO 3.1.1.1 SDM*
    • *

What must SDM be greater than in MODES 1 -2?

A

> 1.3 % ∆p

SDM: The instantaneous amount of reactivity by which the reactor is subcritical or would be subcritical from its present condition assuming:

  • All RCCAs fully inserted
  • Highest reactivity RCCA fully withdrawn
20
Q

LCO 3.1.1.3 MTC

When is LCO 3.1.1.3 MTC Applicable?

A

BOL (+MTC) Limit

MODES 1-2

EOL (-MTC) Limit

MODES 1-3

21
Q
  • LCO 3.1.3.5 S/D Rod Insertion Limit*
    • *

What are your ≤ 1 hour action(s) if 1 S/D rod is NOT fully withdrawn?

A
  • LCO 3.1.3.5 Shutdown Rod Insertion Limit*
  • Action A*
    • *
  • Fully withdraw S/D Rod [1 hr]

OR

  • Declare rod inoperable [1 hr]

AND

  • Apply LCO 3.1.3.1 Movable Control Assemblies [1 hr]
22
Q
  • LCO 3.1.3.1 Movable Control Assemblies*
    • *

What are your ≤ 1 hour action(s) if ≥ 1 rods inoperable due to being immovable due to friction / mechanical interference or is known to be untrippable?

A
  • LCO 3.1.3.1 Movable Control Assemblies*
  • Action A*
    • *
  • Determine SDM [1 hr]
23
Q
  • LCO 3.1.3.4 Rod Drop Time*
    • *

When is LCO 3.1.3.4 Rod Drop Time Applicable?

A

MODES 1-2