Trips And Setpoint Flashcards
Phase A Causes
Manual
Safety Injection
Phase B Causes
Manual
Hi-Hi Containment pressure 2.81 psi on 2/4
CVI Causes
Manual (using Phase A or Phase B HS)
Safety Injection
Hi-Rad on Containment Purge RM-130/131
Manual Phase A or Phase B
Hi Radiation (90-102/103) with HS in Refuel
ABI Causes
Manual
Phase A
Hi-Temp In Aux supply fan inlet >115F
Partial ABI during refueling activities if RM 102/103 go in to Hi rad
CRI causes
Manual
Safety Injection
Hi-Rad in Air intake on RM125/126
Smoke in the Intake
FWI Causes
Rx Trip and Lo Tavg-564F on 2/4
Safety injection
Hi-Hi SG level >82.4% on 2/3 on any 1 SG
Valve Vault room flood 4” on 2/3
MSIV Closure
Hi-Hi Containment 2.81psig
Lo steam Line pressure 675
Hi steam Line Negative Rate 100psi/50sec
SRM Rx trip
10^5 CPs
IRM Rx trip
25% PWR
Safety Injection Signals
Low PZR Pressure 1870psig 2 of 3 logic (Channels I,II,III)
Hi Containment Pressure 1.5psig 2 of 3 logic (Channels II,III,IV)
Low steamline pressure 675psig 2of 3 Logic on 1 of the SGs
Pressurizer Level tree
92% Rx trip
70% Hi alarm
60% normal full load
25% normal no load
17% letdown isolates/ heaters off
VCT levels
93% Hi level/ full divert
63% start divert
41% stop makeup
20% start makeup
13% allow CCP suction
7% Realign to RWST
Pressurizer Pressure tree