AOI Flashcards
1
Q
AOI-2
A
Rod Control
2
Q
AOI-3
A
Dilution/Boration malfunction
3
Q
AOI-18
A
Malfunction of Pzr Press control
4
Q
AOI-4
A
NIS Malfunction
5
Q
AOI-20
A
Malfunction of PZR level control
6
Q
AOI-16
A
Loss of normal Feed
7
Q
AOI-24
A
RCP Malfunction
8
Q
AOI-39
A
Rapid load Reduction
9
Q
AOI-21
A
Loss of 125VDC Vital Battery Boards
10
Q
AOI-37
A
Turbine Runback Response
11
Q
AOI-25
A
Loss of 120 V AC
12
Q
AOI-44
A
Eagle 21 Malfunctions
13
Q
AOI-26
A
Loss of control room annunciations
14
Q
AOI-11
A
Loss of vacuum
15
Q
AOI-2 Immediate actions
A
1.Rods moving If there is uncontrolled rod motion then place control rods in Manual
Check rods stopped if rods continue to move trip reactor
2.Dropped rod. If only 1 rod dropped place rod control to manual
If more than one rod dropped trip reactor