Tower Ladders Flashcards

0
Q

When operating on roof of questionable stability with hand tools and power saw full use of personally harness and LSR shall be used to limit travel of operator too?

A

A radius of 10 feet

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

When using the TL for ventilation purposes to the roof what tools shall be placed in basket?

A

Axe
Halligen
saw
6’ hook and LSR in basket

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

When using the LSR on roof of questionable stability to limit travel how do u secure it to TL?

A

Rope shall be tied to a substantial part of basket use a bowline with 15 foot loop and personal harness

Note pertains to a isolated roof where ventilation cannot be performed from adjacent troop without steeping fully onto roof of fire building

Backup man will hold rope securely

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

When using TL basket for rescue purposes the basket should be lined up to objective by initially elevated too

A

Middle basket railing level with window ledge or level with top railing of fire escape

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

When rescuing incapacitated or obese victims you should line up TL basket

A

Top railing level with sill or top rail of fire escape

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

When operating TL stream into cockloft to extinguish fire you should start stream where then move to where

A

Work stream from party wall balcony of most serious exposure to center than from other party wall of other exposure toward center or roof opening

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When positioning the basket of TL for overhauling purpose where should the railing be placed ?

A

Top of basket railing should be slightly below work area

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

TL ladders are not designed to operate with jacks and outriggers down on one side

Exception:

A

If apparatus not level
Lower jacks and outriggers on low side first
Them jacks and outriggers on high side until unit is level as possible

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

If member decides to abort setting upTL then he must

A
  1. Properly place all outriggers and jacks for operation

2. Return all outriggers and jacks to the pre-setup position

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Floor area of TL basket is

A

Approximately 15 sq ft

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Boom rotation permits water system coverage of

A

360 degrees

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Water system hook ups for TL

A

3x3 gated Siamese on left side

4- 1/2 inlet n right side

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When making reference to movement of the boom it is in reference to the pedestal or basket

A

Pedestal

Rotate left is to pedestal mans left

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Intercom

A

Most effective way to communicate
Check daily prior to use
If intercom check is negativf than use HT
HT also used if basket man operating alone for cd ting or search purposes as means of coordinating with interior forces or if he leaves basket

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Detailed members can operate on pedestal only if

A

Presently assigned to TL

Qualified chauffeurs/tiller man ( school trained )

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If using LSR to secure oneself to substantial part of basket

A

For a one foot in diameter loop
Bowline on bit
Life belt or personnel harness into loop

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

If member leaves basket for search or roof ops do not move basket unless

A

Members are advised
This members give approval or
Visible life hazard

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
17
Q

Unit Commanders shall have members trained in following

A

Place TL in PTO and set appAratus for boom ops
Operate basket controls and pedestal controls and console
Control stang
Be familiar with basic emergency procedures
Assume position of pedestal man
Stretch lines and reposition apparatus

18
Q

A properly positioned TL provides coverage from grade level or below up to a max basket floor elevation of _____ feet at the max ____ degree angle

A

70’

75 degrees

19
Q

The basket while touching a point 32 feet horizontally from center of turntable can reach a basket floor elevation of

A

65 feet

20
Q

Total scrub

A

Front of building 60 feet high and 50 feet wide

Lower 3 floors on building g 100 foot frontage

21
Q

Stub area is

A

Approximately 7750 square feet with turntable 32 feet from building with cab 15 degree angle from building line

22
Q

Basket can reach points how many feet below grade

A

10 feet below grads

23
Q

Grades up to what percent shall be considered level ground

A

4 percent

24
Q

Positioning on hill you should position apparatus so thst boom works on

A

Uphill direction

25
Q

If possible you should face apparatus down hill if facing downhill place turntable ___the objective and if facing uphill place turntable ______ objective

A

Downhill past objective

Uphill before objective

26
Q

Maximum slope for TL op

A

15 degree grade

Difference in 5 1/2 feet from front to rear is approximately 15 percent slope

Recommended work uphill

27
Q

Boom rated at what capacity according to TL ops

A

1000 lb capacity

28
Q

During winter ops the boom of thd TL should be raised to what angle to drain

A

60 degree angle

After boom bed than remove drain plugs on waterway

29
Q

When using a portable ladder from a TL basket to extend the height capability you should sit what type of ladder

A

20 ft combo ladder

May use 25 foot or 35 foot extension ladder (only if no alternative

30
Q

The basket ladder securing ladder is a ______ foot of 1/2 inch rope which has a _____ at what end … This rope is secured to the ladder with rope going threw which rung of the ladder ?

A

15 foot

Hose strap hook

6th rung from butt

31
Q

In attempt to reduce lateral movement when using a portable ladder in the TL bucket, the portable ladder can be raised in line with the boom. If this is done you secure the ladder with rope to where?

A

The Two rear main posts

Note : normally the rope with hook is attached to stang riser and other end of rope is. Attached to horizontal section of waterway or rear basket main post

32
Q

What’s the max amount of members allowed in basket when using a portable from basket

A

3 members

33
Q

If TL is special called for use of elevated streams, you as officer should expect what to be set up prior to your arrival

A

Access cleared
Supply source designated

May have supply lines stretched already

34
Q

Nozzle pressures for TL should not exceed

A

100 psi

35
Q

Notes about raising a portable ladder from a TL basket

A
  1. No time should beams of ladder touch the basket railing
  2. Tips of both beams of portable ladder must rest on building (cantilever forbidden)
  3. Ropes shall not be secured to TL gates or railings
  4. No more than 3 men in basket
36
Q

Utilization of power saw for basket

A

Basket as close to ridge pole as possible
Saw started in basket and then held outside basket
Kept outside until shut off
Use safety belt or LSR tied to substantial part of basket (not Railing )…loop of bowline large enough to allow member to reach edge of basket platform
One foot on roof one in basket
IST cut parallel to ridge pole.. second cut parallel to first forming a triangle third cut at bottom of triangle perpendicular to cut one and two and forth cut knock out cut

37
Q

Breaching walls

A

Power saw with proper blade
Electric or pneumatic hammers may be used
Cuts In brick triangular with vertex angle up
IST and second cuts at brickwork
3 cut at mortar joint
Cut large enough to fit saw in

38
Q

When a building is heavily involved in fire in serval floors, heavy stream delivery should generally start where

A

Lowest floor and work upward

39
Q

When securing the stang nozzle to the TL basket which of the following is not considered an acceptable method

  1. Securing nozzle to railing of basket
  2. Securing to stang base waterway
  3. Or to one of main posts at rear of basket
A

1 securing nozzle to basket railing

40
Q

Water delivery to TL points

A
  1. Satellite best source of supply with largest caliber hose
  2. Supply at base of TL at 200 psi to 250 psi
  3. Relief valve at 250 psi
  4. Generally only one source
  5. Conventional pumpers as close as possible to TL
  6. Relay may take from more than one source
  7. Relay pumper next to TL should have in access of 80 psi on intake with water flowing so delivery in volume to get 250 psi
  8. Shut down at pumper not TL
  9. Do not use TL as standpipe
    10 stretch male of 3 1/2 to TL when possible
  10. Water supply to pumper from pumper other than one supplying first due companies if possible
41
Q

It is responsibility of whom to survey the building after the TL stream is shut off so that the stability of the building can be assessed

A

Officer of TL

42
Q

When taking up when shall you open the hydraulic pressure relief valve on TL

A

After. OOD is bedded and jacks and outriggers are seated

43
Q

If for any reason the limit switch finger on TL sticks you should

A

Move with 6 foot hook and then call fleet maintenance