Topic 13: Introduction To Construction Survey Flashcards

0
Q

Standard Construction Equipment

A

Levels, tapes, total stations, gps.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
1
Q

Why is construction survey needed?

A

For placing stakes for line and grade during construction. Ex: streets, sewer and water lines, structures.

Preparation of “as-built” maps

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Modern Technology Construction Equipment

A

1) Visible Laser-Beam: creates a visible line of known orientation or a plane of known elevation, benchmark.
2) reflectorless total station: employ a pulsed laser light to measure distances up to 100 m to objects without the use of a reflector.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Staking out pipeline.

A

An offset reference line parallel to required centerline is first established (25-50ft stations)

Compute grade
Determine cuts or fills
Surveying report must convey two information: 
1) give depth of cut or fill. 
2) provide precise grade information.
How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Examples of sources of error

A
Inadequate number and/or location of control points on job site. 
Errors of establishing control points 
Observational errors in layout
Careless referencing of key points
Movement if stakes and marks