Testing Processes Flashcards
1
Q
Slump Test
A
The slump test measures the workability of concrete. It must be performed using a frustrum on a flat, level and non-porous surface, on which the concrete is then poured and tempered in stages. The frustrum is then removed and the slump measures. More slump = higher workability
2
Q
A