Test 5 Flashcards
1.
You are managing a project which has a lot of uncertainties involved. Which approach would be best suited for managing this project?
SELECT THE CORRECT ANSWER
Predictive
Iterative
Incremental
Agile
Correct Option:D
EXPLANATION
Agile is the best option. Since the project involves uncertainty, rapid iterations and weekly releases may be required to manage the changes. Agile is basically iterative and incremental in approach, and is built on that. Hence, Agile is the most appropriate answer.
2.
What is the most significant evident outcome you can expect when your team members are empowered?
SELECT THE CORRECT ANSWER
Humility
Leadership
High buy-in and trust
Conflict
Correct Option:C
EXPLANATION
An empowered team always has a better buy-in and displays high levels of trust.
3Team members who have deep knowledge and skills in one area might have general skills in other areas. They are known as ‘Generalizing Specialists’. The term used to refer to this type of skill is:
SELECT THE CORRECT ANSWER
Experts skill
T-Shaped skill
General skill
Extraordinary skill
Correct Option:B
EXPLANATION
T-shaped skill is used to indicate depth in one area and a horizontal spread of knowledge in some other areas.
4
A project involves multi-functional stakeholders collaborating closely on a particular deliverable. As a project manager, what is the best way to ensure that all stakeholders are aware of the changes that may impact them?
SELECT THE CORRECT ANSWER
Talk to them after the change is implemented
Send emails and reports communicating the change
Make the respective managers part of the change control board
Ask your team to communicate to them
Correct Option:C
EXPLANATION
As a project manager, when you make the respective functional managers part of the change control board or CCB, it becomes an effective way for them to analyze and understand the impact of the change.
5
As a project manager, you are midway through the project. You want to measure the progress by comparing actual performance with planned baselines. Which of the following will be most useful?
SELECT THE CORRECT ANSWER
Decision tree
Scatter diagram
Earned value analysis
Value stream mapping
Correct Option:C
EXPLANATION
Earned Value Analysis or EVA helps track the performance with respect to cost and schedule. A decision tree is used in risk management, while a scatter diagram is used to correlate the relationship between two variables in quality management.
6
As part of project planning, you refer to organizational practice and defined tolerance limits. Which of the following includes the key areas where tolerance limits are set?
SELECT THE CORRECT ANSWER
Quality, budget
Budget, time, quality, and non-functional requirements
Budget, time, and quality
Scope, schedule, and cost
Correct Option:B
EXPLANATION
Besides setting a tolerance limit for budget, quality, and time, you also need to define acceptable limits for deviations (non-compliances) for non-functional requirements. This will help you as a project manager to move forward swiftly with minimal escalations.
7
Tracking compliance information, including the proof of validation for each deliverable, is generally done as part of:
SELECT THE CORRECT ANSWER
Scope management
Stakeholder management
Risk management
Configuration management
Correct Option:D
EXPLANATION
One of the key attributes to be tracked is compliance of a deliverable with a defined requirement. Tracking the proof for validation of the compliance of the deliverable is done as part of configuration management (although it might sound like compliance management).
8
A document that contains details of how you will approach, structure and manage risks in a project is called:
SELECT THE CORRECT ANSWER
Risk management plan
Compliance management plan
Mitigation plan
Project strategy document
Correct Option:A
EXPLANATION
This is one of the important plans which is part of the project management plan.
9
A risk breakdown structure is created as part of:
SELECT THE CORRECT ANSWER
Risk qualitative analysis
Risk identification and categorization
Risk response
Risk ownership
Correct Option:B
EXPLANATION
Once the risks are identified, they are categorized based on the source, like external, internal, technical, and project management. This gives the risk breakdown structure.
10
The document that captures how the team would norm, perform and resolve conflicts among themselves is:
SELECT THE CORRECT ANSWER
Project charter
Resource calendar
Team charter
Team plan
Correct Option:C
EXPLANATION
Team charter captures how the team will operate and work together, including how conflicts will be resolved among themselves.
11Which of the following best describes a stakeholder?
SELECT THE CORRECT ANSWER
An individual who is interested in the project
An individual or group of individuals or an organization that impacts or is impacted by the project
Anyone who is watching the project
Anybody working on the project
Correct Option:B
EXPLANATION
Stakeholder is an individual or group of individuals or an organization that impacts or is impacted by the project.
12Conflicts are inevitable in projects, but when managed well, they can create opportunities. What is the best way to deal with a conflict?
SELECT THE CORRECT ANSWER
Stay away and let the team decide
Facilitate collaboration
Take disciplinary action against individuals
Have informal dialogue with conflicting individuals
Correct Option:B
EXPLANATION
Conflict management is a skill and the option depends on the situation. However, the solution arrived through collaboration has long-lasting results and is generally recommended.
13A document that is normally prepared before the business case and expresses what needs to be produced or what is the goal of the project is called:
SELECT THE CORRECT ANSWER
Business needs document
Business case
Customer requirements document
Requirements documentation
Correct Option:A
EXPLANATION
The business needs document captures the goal of the project product or service what needs to be created.
14You are assigned a construction project which involves constructing a multi-storeyed mall in your city. When you analyze the historical data of your organization, you come across many useful data of similar projects that have been successfully executed and delivered in the past, which gives you confidence. Which of the following approaches is best suited?
SELECT THE CORRECT ANSWER
Agile
Hybrid
Incremental
Predictive
Correct Option:D
EXPLANATION
Where you have sufficient expertise, a predictive or waterfall approach can be best suited.
15The data analysis technique used to identify different ways of collecting requirements to elaborate on project and product scope is called:
SELECT THE CORRECT ANSWER
Design of experiments
Iterative gathering
Alternative analysis
Brainstorming
Correct Option:C
EXPLANATION
Alternative analysis is the evaluation of various ways in which requirements can be collected from stakeholders, and this can have an impact on the scope management plan.
16SMART acronym is used while defining KPIs. While generally the ‘R’ in the acronym stands for ‘Realistic’, in the context of project management it denotes:
SELECT THE CORRECT ANSWER
Real time
Recurring
Relevant
Reasonable
Correct Option:C
EXPLANATION
The target needs to be relevant in the context of the larger objectives and critical success factors.
17You have just been handed over a project charter. You are assessing the project needs, magnitude and complexity. You find that the project needs a mix of resources and experience levels. You also observe that some new methods or techniques need to be used specific to the project. Which among the following project management approaches will be suitable?
SELECT THE CORRECT ANSWER
Plan driven
Iterative
Agile
Hybrid
Correct Option:D
EXPLANATION
Since some new methods or techniques are to be used, a hybrid approach, which is a mix of predictive and adaptive, can be used.
18You are in the process of assessing the performance of your team productivity. You want to use the data to predict the output for future iterations as well. The tool that is generally used for this is:
SELECT THE CORRECT ANSWER
Velocity
RACI matrix
Throughput
Kanban
Correct Option:A
EXPLANATION
It is the sum of the story point sizes for the features actually completed in an iteration. This allows the team to plan its next capacity more accurately by looking at its historical performance.
19Mind Mapping and Affinity Diagram are examples of:
SELECT THE CORRECT ANSWER
Techniques for data consolidation
Techniques for data gathering
Techniques for data elicitation
Techniques for data representation
Correct Option:D
EXPLANATION
Mind mapping and affinity diagram are examples of techniques for data representation.
20Which leadership style integrates well into the Agile mindset?
SELECT THE CORRECT ANSWER
Transactional
Transformational
Servant leadership
Laissez-faire
Correct Option:C
EXPLANATION
Servant leadership integrates well since Agile believes in empowering the team and helping them self-organize.
21Which of the following is effective in measuring project compliance with quality? (Choose two)
SELECT THE CORRECT ANSWER(S)
Using QA outputs to confirm deliverable compliance
Risk analysis
Issue resolution
Sign-off and approval from stakeholders
Correct Option:A, D
EXPLANATION
Both QA outputs to confirm deliverable compliance and Sign-off and approval from stakeholders are effective in measuring project compliance with quality.
22Continuous improvement framework is associated with:
SELECT THE CORRECT ANSWER
William Smith Jr.
Joseph Juran
Edward Deming
Philip Crosby
Correct Option:C
EXPLANATION
PDCA-Plan, Do, Check, Act, also known as Deming’s cycle, was first given by Deming, which is a framework used for continuous improvement.
23Which of the following tools help you identify quality issues in the project? (Choose two)
SELECT THE CORRECT ANSWER(S)
Audits
Histograms
Design thinking
Control charts
Correct Option:A, D
EXPLANATION
Control charts will help in analyzing the process control and potential issues.
24Henry is the project manager who is in the process of understanding the requirements. He is going through the available Business and Marketing plan, service agreements, and process diagrams. What technique is he using?
SELECT THE CORRECT ANSWER
Requirements mapping
Document analysis
Traceability matrix
Brainstorming
Correct Option:B
EXPLANATION
A technique where the existing available documents are gone through to generate more understanding about the project’s requirements.
25A prototyping method that can use visuals or images to illustrate a process or represent a project outcome is called:
SELECT THE CORRECT ANSWER
User empathy
Storyboarding
User view
User diagram
Correct Option:B
EXPLANATION
Storyboarding is usually a visual representation, which results in better communication and understanding of requirements with stakeholders.
26
In Agile projects, teams use a ceremony to communicate and address impediments slowing down the progress of work. This ceremony is called:
SELECT THE CORRECT ANSWER
Retrospective
Scrum facilitation
Daily stand-ups
Sprint review
Correct Option:C
EXPLANATION
A daily stand-up meeting with the scrum team is a daily routine which serves as a communication platform for the team to address blocks and impediments.
27Common causes of conflict in a team include: (Choose any three)
SELECT THE CORRECT ANSWER(S)
Differences due to work, role, and approach
Differences in values and perceptions
Different time zones
Communication breakdown
Correct Option:A, B, D
EXPLANATION
Although working styles differ, differences in perceptions cause conflict, and communication breakdown is generally a cause and effect of conflicts.
28The right sequence for Tuckman’s stages for team formation includes:
SELECT THE CORRECT ANSWER
Forming, norming, storming, and performing
Forming, storming, norming, performing, and adjourning
Storming, performing, laning, and waning
Forming, grooming, performing, and disbanding
Correct Option:B
EXPLANATION
Forming, storming, norming, performing, and adjourning is the right sequence.
29Common tools to track the performance of a team in AGILE include: (Choose two)
SELECT THE CORRECT ANSWER(S)
Scrum or Kanban board
Throughput
Project board
Blackboard
Correct Option:A, B
EXPLANATION
Common tools to track the performance of team in AGILE includes: Scrum or Kanban board and throughput.
30As an experienced project manager, you know that coaching and mentoring are important to mentor stakeholders when required. You ask the junior team member to follow you on the job. What is this referred to as?
SELECT THE CORRECT ANSWER
Job shadowing
Hands-on training
Reverse mentoring
Training
Correct Option:A
EXPLANATION
Job shadowing helps to learn the work cultures of any organizations.
31Control accounts can contain more than one—————————–, but each ————– is assigned to only one control account.
SELECT THE CORRECT ANSWER
WBS
WBS dictionary
Work package
Planning package
Correct Option:C
EXPLANATION
Control accounts can contain more than one work package, but each work package is assigned to only one control account.
32One of your team members, who is not very experienced in Agile methodologies, is informing you that the product owner has made some changes to the product backlog and has explained the changes to the team. The other team members have accepted and made changes to the backlog. This new team member is not sure if this is the normal practice in Agile. You explain to him that the product backlog changes throughout the project. The term that refers to this practice of changing the product backlog based on changes to business requirements is called:
SELECT THE CORRECT ANSWER
Product backlog item
Backlog grooming and refinement
Daily stand-up
Retrospective
Correct Option:B
EXPLANATION
In backlog grooming and refinement, the product owner is tasked with the responsibility of looking at the impact of any change and looking at ways to reprioritize the backlog items.
33Agile projects tend to avoid using absolute time estimates as the level of uncertainty in the work is often high. Instead, a relative measure of estimation is used. Which of the following is an example of the relative estimation method?
SELECT THE CORRECT ANSWER
Factoring
Three point estimating
Story point estimating
Planning poker
Correct Option:C
EXPLANATION
Requirements are explained as stories and story points rate the relative work, risk, and complexity of a requirement or story. Agile teams use story points to estimate effort.
34Changes to external and internal environmental factors can affect the project and its outcomes. A framework used to analyze the external factors impacting the project is:
SELECT THE CORRECT ANSWER
Business complexity
Competitive strategies
PESTLE
SMART
Correct Option:C
EXPLANATION
PESTLE (stands for Political, Economic, Social, Technological, and Environmental) is used to analyze the external factors which impact the project.
35
A team’s checklist for a user-centric requirement that has all the information the team needs to be able to begin working on is called:
SELECT THE CORRECT ANSWER
Definition of done
WBS
Definition of ready
Scope delineation
Correct Option:C
EXPLANATION
Definition of ready is a team’s checklist for a user-centric requirement that has all the information about the team’s needs.
36A PMO that directly takes control of the project by managing the project directly is known as:
SELECT THE CORRECT ANSWER
Supportive PMO
Directive PMO
Controlling PMO
Organizational PMO
Correct Option:B
EXPLANATION
Directive PMO directly takes control of the project by managing it directly.
37The famous Quality Trilogy is attributed to:
SELECT THE CORRECT ANSWER
Peter Drucker
Joseph Juran
Philip Crosby
Edward Deming
Correct Option:B
EXPLANATION
The Juran trilogy gives the concept of quality management with its underlying three universal processes of quality planning, quality control, and quality improvement.
38You are managing a healthcare project to develop an IT solution for a hospital. Upon going through the requirements, you notice that you need to comply with some industry standards like HIPAA, HL7, and so on. This is an example of:
SELECT THE CORRECT ANSWER
OPA
PMO policy
EEF
Transition requirement
Correct Option:C
EXPLANATION
Enterprise environmental factors, or EEF, have an impact on your project and its outcomes.
39Which of the following defines an analytical technique that uses mathematical models to forecast future outcomes based on historical results?
SELECT THE CORRECT ANSWER
Performance reporting
Document analysis
Decision tree analysis
Trend analysis
Correct Option:D
EXPLANATION
Trend analysis gives the improvement trend based on which intervention can be decided.
40Your team is very experienced in the predictive approach. The new project that is being taken up now requires an Agile approach. You need to support and mentor the team members for the required transformation. Which of the following will be most useful in this situation? (select two)
SELECT THE CORRECT ANSWER(S)
Reading Agile magazines
Training team members in Agile ceremonies
Lessons learned from previous Agile projects
Outsource a specialist Agile team
Correct Option:B, C
EXPLANATION
Historical lessons from previous projects will also be helpful.
41Which of the following are considered to be part of interpersonal and team skills? (Choose two)
SELECT THE CORRECT ANSWER(S)
Team capabilities assessment
Emotional intelligence
Motivation
Active listening
Correct Option:B, D
EXPLANATION
Emotional intelligence and active listening are part of interpersonal and team skills.
42Business risks impact the project. Choose three business risks from the following:
SELECT THE CORRECT ANSWER(S)
Competitive
Scope related
Legislative
Operational
Correct Option:A, C, D
EXPLANATION
Competitive, legislative, and operational risks are the business risks that impact the pr
43John, the project manager of an oil exploration company, is assessing the risks of beginning offshore drilling activity. He finds that the activity is scheduled in the month of July. Generally, around the month of July, there are a lot of hurricanes or cyclones that are formed in the sea. He decides to reschedule these activities until mid-August. What kind of risk response is this?
SELECT THE CORRECT ANSWER
Escalate
Avoid
Transfer
Accept
Correct Option:B
EXPLANATION
The avoid strategy involves a change in the plan such that the risk is avoided to escape the impact.
44You are in the process of assessing the compliance to quality metrics of the deliverable to find out any deviations. You are evaluating the results against the planned values. What technique are you using?
SELECT THE CORRECT ANSWER
Variance analysis
Performance reporting
Inspection
Paired comparison
Correct Option:A
EXPLANATION
Variance analysis is comparing the actual to planned values.
45A classification model that groups stakeholders on the basis of their level of authority, their immediate needs, and how appropriate their involvement is in terms of the project is known as:
SELECT THE CORRECT ANSWER
Impact grid
Salience model
KANO model
None of the above
Correct Option:B
EXPLANATION
This classification model uses power versus legitimacy, or urgency of stakeholders.
46Joe, the project manager, believes in empowering the team as a definite means to achieve performance. It was agreed that the team would decide on all issues through consensus. One of the team members brings to the notice of Joe that decisions are arriving very late and that is impacting the project. What should Joe do to correct the situation?
SELECT THE CORRECT ANSWER
Ask the team to re-create the team charter
Get into problem solving directly
Suggest the team to have timelines for resolution
Let the team decide
Correct Option:C
EXPLANATION
This is the best option since the problem should not recur.
47You are preparing a report on your work performance for your key stakeholders. Last week, some unexpected delays in work execution happened due to lack of resources. Because of this, the progress for last week is static. However, this was corrected later. Your team member suggests that instead of showing no progress, it would be better to show the overall progress rate for the last one month, so that last week’s static progress may not be glaringly visible. The member argues that the delay shown in the report may delay the payment which is to be released based on this report. You reject the idea because:
SELECT THE CORRECT ANSWER
It does not conform to PMI standards of ethics
It is coming from a team member
It might affect your image and reputation
It was not presented earlier
Correct Option:A
EXPLANATION
It is unethical to report wrong status or camouflage actual findings or state half truths.
48You have successfully completed a project for setting up a e-commerce website. You have conducted a successful demonstration of the portal and the customer is happy. The product is transitioned and the site is thrown open to public. After a month, when the traffic increased, it is noticed that the response of the website became very slow. You get a call from customer asking you to fix the issue immediately. You find that this is primarily due to the sizing of the hardware. What requirement should have been taken care of to avoid this scenario?
SELECT THE CORRECT ANSWER
Operational requirements
Training
Non-functional requirements
None of the above
Correct Option:C
EXPLANATION
Non-functional requirements, or NFR, include capacity, availability, scalability, and security, which need to be carefully analyzed and understood before making the design.
49A new team member has joined your team. The team lead is explaining the overarching solution by describing the various aspects of the solution in the way a marketer would do for a product. This technique is known as:
SELECT THE CORRECT ANSWER
Sensitization technique
Product box
Knowledge transfer
User story
Correct Option:B
EXPLANATION
The features of a product are explained like a marketer would.
50A high-level visual summary of the product or products of the project that includes goals, milestones, and potential deliverables is called:
SELECT THE CORRECT ANSWER
Product roal
Product strategy
Product roadmap
Product lifecycle
Correct Option:C
EXPLANATION
Product roadmap contains milestones and deliverables over a period of time.
51You and your team are engaged in the process of finding out redundancies, bottlenecks, and non-value efforts in a process end-to-end that can potentially cause unnecessary delays. What process are you involved in?
SELECT THE CORRECT ANSWER
Value stream mapping
Process mapping
Root cause identification
None of the above
Correct Option:A
EXPLANATION
The focus of the value stream mapping exercise is to not only remove wasteful efforts to make processes lean, but also to ensure maximum value flow to customers.
52You are in the process of defining the scope of the product that will be delivered as the final output of the project. You are analyzing the product in terms of characteristics and using all relevant aspects of the product to better understand it. What kind of tool are you using?
SELECT THE CORRECT ANSWER
Scope verification
Value analysis
Requirement analysis
Product analysis
Correct Option:D
EXPLANATION
Product analysis is thorough analysis of the features for better understanding.
53A construction company is executing a roadway project which involves the laying of state highway roads. The government has allotted another project to the same company for re-aligning some culverts along the highway. Although the construction company is not very experienced in erection of culverts, it has decided to use the opportunity to outsource the culvert construction to another company that specializes in the same. This is an example of what type of risk strategy?
SELECT THE CORRECT ANSWER
Accept
Share
Avoid
Mitigate
Correct Option:B
EXPLANATION
You share the opportunity with the other company.
54You and your team are finalizing the project’s scope statement. The scope statement contains: (Choose two)
SELECT THE CORRECT ANSWER(S)
Work, deliverables
Assumptions and constraints
Resources
WBS
Correct Option:A, B
EXPLANATION
Scope statement includes description of work, deliverables, assumptions and constraints.
55In Earned Value Management, or EVM, the term used to explain how much more money is needed to complete the remaining project is known as:
SELECT THE CORRECT ANSWER
Estimate to complete
Actual cost
Budget at completion
Estimate at completion
Correct Option:A
EXPLANATION
Estimate to complete, or ETC, is the term which explains how much more money is needed to complete the remaining project.
56Which of the following are part of the resource calendar? (Choose two)
SELECT THE CORRECT ANSWER(S)
Training dates
Availability of resources
Interdependencies between resources
Working days
Correct Option:B, D
EXPLANATION
Availability of resources and working days are part of the resource calendar which gives the period of engagement of resources.
57The goals of retrospectives in Agile are different from sprint reviews. A retrospective is not: (Choose two)
SELECT THE CORRECT ANSWER(S)
Demonstration of the product
Generate insights
Identify areas for improvement
Getting feedback on the product
Correct Option:A, D
EXPLANATION
Retrospective is done to generate insights and identify areas for improvement.
58A team member is working on identifying areas for improvement in the project. He wants to know how to go about it. Which of the following would be a good source to start with?
SELECT THE CORRECT ANSWER(S)
Historical lesson learned
Sprint review
Demonstration
Meetings
Correct Option:A, D
EXPLANATION
Lessons learned from previous projects are a good starting point to identify areas for improvement. Then you look at lessons from retrospectives in this project.
59A technique that uses computer models to translate risks into detailed levels to understand their potential impact on project objectives is known as:
SELECT THE CORRECT ANSWER
Extrapolation
Risk response
Simulation
Risk breakdown
Correct Option:C
EXPLANATION
Simulating various possible outcomes helps with planning a suitable response.
60Change requests approved by the change control board normally consist of: (choose three)
SELECT THE CORRECT ANSWER(S)
Preventive actions
Scope control
Defect repair
Corrective actions
Correct Option:A, C, D
EXPLANATION
Change requests can comprise preventive actions, corrective actions, and defect repair.
61You are starting a new IT project which involves migration of data from on premises hosting to cloud hosting. You foresee a lot of risks in the migration process due to inherent constraints in the existing infrastructure. You want to identify team members with very good skills. Which of the following techniques will be useful? (Choose three)
SELECT THE CORRECT ANSWER(S)
Specific assessment
Attitudinal survey
Ability tests
Reference from HR
Correct Option:A, B, C
EXPLANATION
Specific assessments, attitudinal surveys, and ability tests are used to identify team members with very good skills.
62It is important to have a written agreement in procurement because:
SELECT THE CORRECT ANSWER
It is the practice of your organization.
It gives you the advantage of clear terms.
It legally binds both the seller and purchaser.
None of the above
Correct Option:C
EXPLANATION
In the case of a legal dispute, either party can go to court for remedies.
63The presence of a set of factors which may not motivate but the absence of which would definitely demotivate the team members is known as:
SELECT THE CORRECT ANSWER
Reward factors
Hygiene factors
Motivational factors
X factors
Correct Option:C
EXPLANATION
According to Herzberg’s theory, real motivational factors are responsibility and recognition.
64What is the purpose of a risk audit?
SELECT THE CORRECT ANSWER
To ensure responses are implemented
To transfer risks to a third party
To evaluate the overall effectiveness of the risk management approach
All of these
Correct Option:C
EXPLANATION
Risk audit is used to evaluate the overall effectiveness of the risk management approach.
65Your team is in the process of finalizing the type of contract for procurement. It is observed that the procurement statement of work is not precise and there are some constraints which do not permit further clarity in defining the statement of work. It is agreed amongst stakeholders that the team can go for a slightly open-ended and flexible arrangement with the seller. Which of the following contract types would be best suited?
SELECT THE CORRECT ANSWER
Fixed price incentive fee contracts
Cost plus fixed fee
Time and materials or T and M
Fixed price-EPA
Correct Option:C
EXPLANATION
Time and materials or T and M contract works best for flexible arrangements.
66Your company is bidding for two projects at the same time. Project A is expected to generate USD 200 million in aggregate revenue over the next three years, while Project B is expected to generate USD 280 million.You select project A based on the NPV method. What is the opportunity cost for project A?
SELECT THE CORRECT ANSWER
80 M
480 M
280 M
600 M
Correct Option:C
EXPLANATION
280 M is the opportunity cost for project A.
67You are starting a new space related project. A project charter has been created and handed over to you. What is the next step?
SELECT THE CORRECT ANSWER
Sign the charter for acceptance
Start planning
Identify stakeholders
Identify risks
Correct Option:C
EXPLANATION
The next step is to identify stakeholders in the project.
68A software upgrade project is underway. You notice that many stakeholders are not participating actively in the meetings. You decide to find out the cause. Which document of the following will be most useful?
SELECT THE CORRECT ANSWER
Stakeholder engagement plan
Communication management plan
Configuration management plan
Risk management plan
Correct Option:A
EXPLANATION
Although both stakeholder and communication plans may need a revisit, the first would be the stakeholder engagement plan.
69One of your key stakeholders wants to review the product’s completion by comparing it against the requirements. Which document would you present to him?
SELECT THE CORRECT ANSWER
Project scope statement
Product requirements
WBS dictionary
Requirement traceability matrix
Correct Option:B
EXPLANATION
Completion of product scope is compared against product requirements.
70You have requested a resource who you rate very highly since she worked with you on the last project. Your expectation was that she would do an excellent job on this project too. However, to your disappointment, you notice that she is not performing as well as expected. Which empirical rule did you not follow?
SELECT THE CORRECT ANSWER
Performance rule
Halo effect
Heuristics
Thumb of Rule
Correct Option:B
EXPLANATION
The halo effect refers to expecting the same performance from a resource based on their performance in earlier, different projects.
71Your team is in the process of classifying the identified stakeholders. One of the members from the customer organization seems to be highly interested in the outcome of the project but does not seem to have any authority. What is the best strategy to manage such a stakeholder?
SELECT THE CORRECT ANSWER
Manage them closely
Monitor them
Keep them informed
Don’t bother about them
Correct Option:C
EXPLANATION
The stakeholder classification based on the power-interest model groups them as high on interest and low on power. The strategy recommended is to keep them informed.
72An organizational construct that focuses on the flow of value to customers through delivery of specific products and services is called:
SELECT THE CORRECT ANSWER
Product strategy
Value stream
Service delivery
Product catalogue
Correct Option:B
EXPLANATION
Value stream is the value delivered to customers through a product or service.