test 2.6 Flashcards

1
Q

bid invitations

outfeed of 16 straight table: with messages being sent out to interested people

A

Contractors send out messages to material dealers and subcontractors who are believed to be interested in bidding

via email, mail, fax

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

bid invitation information

carts outfeed 20: with fill line and designed forklift person to pick up

A

 Deadline for receiving proposals, place where bids will be accepted, name of person to whom a proposal should be directed, place where bidding documents are available

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

bid invitation database.

back stop out feed 20: with number counter of sheets pulled by each employee.

A

 Contractors shall maintain / update a database containing supplier and subcontractor information

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

quantity surveys

out feed 10 carts: with a level on the side. for pricing

A

 Accurate quantity survey ( or quantity takeoff) is required for both lump-sum and unit-price bid

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

quantity surveys during constructions

outfeed 10 circle: displaying equipment and EEs

A

o Useful data to determine duration of work, size of crews, and equipment needs

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

professional quantity surveyors.

outfeed 10 middle fan: special ed fan

A

Some firms specialized in quantity takeoff and cost estimating

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

professional quantity surveyors.
hired by owner A-E

outfeed 10 water fan: survey for best fan for the job

A

Undertaking survey after the design has been completed or acting as a cost advisor

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

professional quantity surveyors.
in great Britain

old path next to 10: with the cardinal line up

A

Established professional services
(Cost feasibility studies, construction budget, cost check at all stages of the design process, and final quantity takeoff)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

professional quantity surveyors.
standard in US

gate to 10 beginning: own your push

A

o Duty of contractors to make their own quantity takeoffs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

material cost

double doors to new space: with all parts in that room

A

Everything that will be incorporated into the finished structure ranging from steel and lumber to elevators and boilers

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

material usually purchased from

cross gates: ds dm

A

dealer, supplier, distributor, or manufacturer

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

material cost Substitution

corner new room older ladder: with a price tag on it.

A

Identifies substitute product and indicates the difference in price to the owner

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Material Cost
 Allowance:

infeed section 26: with parents allowance money for eggs.

A

Designated allowance amount is used to prepare a proposal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Material Cost
FOB

infeed section 26: free location to pick up a conversation.

A

Free on Board :
A material vendor is responsible for presenting goods free on board at some mutually agreed upon point such as vendor’s sales location

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Material Cost
CIF

ladder to top of 26: with insurance begging for fall protection or else a train is comming down.

A

Cost, Insurance, and Freight

Quoted prices include item cost plus shipment cost to include freight and insurance expenses to the FOB location

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Direct labor cost

confined space top of 20: cheap labor isn’t quality lunch box.

A

 Function between basic wage rates, quantity of work, and production rates

17
Q

direct labor

fall protection wires: question if will work. History book says maybe.

A

 Production rate is a factor with high level of uncertainty
 Productivity shall be determined from in-house historical data

Be cautious when using data from external sources

18
Q

indirect labor

catwalk: blue shield

A

 Expenses that

E.g. Payroll taxes, insurance, and employee fringe benefits

19
Q

indirect labor
fringe benefits

outfeed 26: vacation for a doctors appointment.

A

Pension plans, health insurance, paid vacation, and apprenticeship programs

20
Q

indirect labor
 Expenses that

outfeed belt: insurance and tax paper.s

A

Are additional to the basic hourly rate

E.g. Payroll taxes, insurance, and employee fringe benefits

21
Q

Equipment cost

under 26 bent: screws holding up gate.

A

Refers to items being used to accomplish the physical work

22
Q

Equipment cost accounts for

stair to out fed 26: engineer concrete steps metal contruction

A

a greater proportion of the total cost of engineering projects than building constructions

23
Q

Equipment cost
cost heavy equipment

computer section 26: separated from plywood finger demanding

A

equipment
Refers to items being used to accomplish the physical work

cost needs to be estimated separately and with care

24
Q

Equipment cost who determines what type of ownership

A

contractors where to purchase, lease, or rent

25
Q

Equipment cost

operators

A

normally included in labor cost

26
Q

Equipment cost

lump some

A

Purchase new equipment for the project and sell it at the end of construction project

Equipment expense= (purchase price-estimated salvage value)

27
Q

Equipment cost

renting or lease of equipment

A

Applying lease or rental rates for project period

28
Q

equipment cost

ownership cost

A

fixed cost
Taking place during the period the owner owns the equipment (e.g. Financing cost, interest, taxes, insurance, and depreciation

29
Q

equipment cost

operating cost

A

Variable costs
Only occur during the operation of machine
(e.g. Fuel, oil, grease, repair and maintenance, and tire replacement)

30
Q

owners cost

a personal man lift:
glued or fixed to that location. pedro owns the machine

A

Fixed costs

Taking place during the period the owner owns the equipment (e.g. Financing cost, interest, taxes, insurance, and depreciation)

31
Q

operators cost

trash hoppers:
trash line changes. Only move when filled.

A

Variable costs

Only occur during the operation of machine

(e.g. Fuel, oil, grease, repair and maintenance, and tire replacement)