Test 2 Flashcards
3 Generic Classifications of DoD Software Systems
i. Weapons Systems – software is embedded in the weapon system; performs highly specific functions
ii. Command, Control, Communications, Computers and Intelligence, Surveillance and Reconnaissance (C4ISR) - decision support for commanders
iii. Defense Business Systems (DBS) - used for routine administrative applications
What type of contract has the highest risk?
Cost based
Which type of contract has the lowest risk?
Fixed Base
Small business set asides at what dollar value?
$3,000-150K
At what percentage of a small business must be owned by socio/economically disadvantaged personnel
a. Small Disadvantaged Business – 51% unconditionally owned by 1+ individuals who are both socially/economically disadvantaged
b. Women-Owned small businesses – 51%
c. Service-Disabled Veteran Owned Small Business program – 51%
d. HUBZone – 35% employees reside in HUBZone
Define a System
Aggregation of end and enabling products
5Ms of Manufacturing?
a. Material – all raw materials that are needed to produce the parts/assemblies for the system and for the production equipment itself.
b. Method - the method that raw materials are formed, shaped and held together
c. Machinery – varies in types, particularly in terms of the volume of production. Robotics and automated machines differ from those requiring a dedicated operator
d. Manpower – The utilization of people
e. Measurement – The systems needed to measure things; provide precision and accuracy in the manufacturing process
Why do we use the 5Ms?
To ensure the design can produce a uniform, defect, reproducible product
Define Risk
A measure of future uncertainties in achieving program technical performance goals within defined cost and schedule constraints
Configuration Baseline
formally documents design requirements at different levels of detail; defines an item’s functional and physical characteristics
Functional Baseline –
overall system performance req’ts including interfaces
b.
Allocated Baseline –
functional specifications; performance characteristics of specific configuration items, including form, fit, function
Product Baseline –
Item detail specifications. Process and procedure material details, technical documentation
Who is responsible for the product baseline
The Contractor
What are the three components of risk?
a. a future root cause
b. a probability or likelihood of that future root cause occurring
a. Consequences of that future root cause.
What is the ideal Leadership style for IPT?
Team
What type of Quality Management Process must contractors have?
Contractor must have a quality management process but the contractor defines the process (must meet Government objectives)
a. Third party certification/registration of process is not required
6 Ethical Core Values
a. Trustworthiness
b. Respect
c. Responsibility
d. Fairness
e. Caring
f. Citizenship
Define Ethics
set of behavioral standards for a group of people or society or as standards of conduct that shape one’s behavior with respect to moral duties and obligations
What are WBS Categories? How Many are there?
11;
i. Aircraft
ii. Electronic/Automated Software
iii. Missile
iv. Ordnance
v. Ship
vi. Space
vii. Surface Vehicle
viii. Unmanned Air Vehicle
ix. Unmanned Maritime Systems
x. Launch Vehicle Systems
xi. Automated Information Systems
What are WBS Category Elements? How Many?
10;
i. Integration, assembly, test, and checkout efforts
ii. Systems engineering/program management
iii. System test and evaluation
iv. Training
v. Data
vi. Peculiar support equipment
vii. Common support equipment
viii. Operational/site activation
ix. Industrial facilities (construction, conversion or expansion)
x. Initial spares and repair parts
What is an output of system engineering
Work Breakdown System
What is a WBS used for?
planning logistics, establishing schedules, tracking cost and predicting variations.
What does a Functional WBS ask?
What must it do?
Two types of WBS?
Product & Functional
What are the two type of product WBS’ and who is resonsible for them? At what level?
a. Program
i. Developed by the gov’t
ii. Entire wbs for the program
iii. Consists of the first three levels
b. Contract
i. Developed by the contractor (4th level- “n”)
ii. Compete wbs for the contract
iii. Contains lowest reporting level agreed upon in the contract
- What type of testing is normally conducted on those tasks performed at field level and some sustainment level by User representatives?
Logistical Demonstration
who reports to the USD for operational testing?
DOT&E ( Director, Operational Test & Evaluation) – principal staff assistant and senior advisor to the SECDEF on operational test and evaluation (OT&E) in the DoD.