Systems Flashcards
RCP Overcurrent Trips
Hot: 640A Cold: 800A Always cold, hot or not Protects bus and pen Primary: trip/lockout bkr B/U: Bus diff relay (TD)
EDG Start Sequence
LOP signal ———————————————— Slow transfer attempt (5 sec) EDG starts Tie Bkr opens ———————————————— EGLS LOP strip Bus UV lockout (6 min to reset) ———————————————— Bus stripped permissive ———————————————— EDG Bkr auto closure (9 sec)
Fast Transfer
Adequate voltage (97/90% → 4/6kV) Bus-tie closed Attempt <7.5 cycles (6 → 6.9kV) Red-flagged (not UV) No RSST or NSST b/u LO
Slow Transfer
Bus-tie open
Adequate voltage (97%)
Lockouts reset
Loss of voltage (30%)
4kV only
If successful, EGLS doesn’t see LOP, so SWP-AOV39s don’t open
EGLS
Power from VIAC-1/2
Energize to actuate
Test 1: signals reset (respond if not inhibited)
Test 2: signals don’t reset (combo)
Sequencer Reset: resets memory so ops have control (EGLS/MB2/ASP)
Station Reset: resets LOP (EGLS)
EGLS
LOP
CHS ABF AFW SW HVK
CCP
CAR
CRDM
EGLS
SI
CHS ABF AFW SW HVK
CCP
CAR
CRDM
SI
RHR
EGLS
CDA
CHS ABF AFW SW HVK
SI
RHR
QSS
RSS
EDG Trips
110% over speed
50# lube oil
Primary Lockout
Pump Runout Flows
CHS: 560/880
SI: 650/830
RHR: 5500/10,000
QSS: 5200/6500
SW Pp Flow Criteria
Min:
1 pump: 1 CCP or 2 CCS
1 pp/train: 1 CCP and 2 CCS
Max:
1 pump: 1 of each
1 pp/train: 2 of each
CCP Signals
NS hdr isolates on 68%, LOP, CIA
CTMT hdr isolates on CIB
X-conn close on 68%, SI
CDS x-conn close on 68%, open on LOP, CIA
CCP Headers
CTMT:
A: LDHX, RCP A/D
B: ELHX, SRHX, CCE, RCP B/C
CAR, NSS on LOP/CIA
Safety: RHR, SFC, CCI (A)
PZR Pressure Control
2350 - PORV opens 2330 - PORV closes \+75 - Spray full open \+25 - Spray starts to open \+15 - Controlling htrs off 2500 - Pref -15 - Controlling htrs on -17 - B/U htrs off -25 - B/U htrs on
VCT
% 112 185 ——————————————— 96: To BRS, A - A 66-99: - To BRS 41-54: Auto M/U - 16: ≠ GWS, A - A 4: Swap to RWST(2/2)