What notifications must be made prior to APS personnel enter the 525kV switchyard?
AO to Unit 1 shift manager
shift manager to ECC
ECC to TGO
What step and appendix of the 40DP-9OP34 procedure describes the restricted safe access area for high risk situations?
step 4.14 and appendix E
Who controls Vehicle access to the 525kV switchyard?
Unit 1 shift manager
Who must be called prior to vehicle access to the start up transformer yard?
unit 1 shift manager and switchyard coordinator
What must the unit 1 shift manager take into consideration prior to allowing vehicle access in the switch yard?
planned proximity to equipment
status of current electrical distribution
any special events or conditions for all units
under normal circumstances, who performs all 525kV switching operations?
SRP personnel
When SRP switchmen are not available, where do aps personnel acquire the SRP System key and control house key?
plant west side of control house next to the door
Who must direct PVGS operations to perform emergency switching in all parts of the switchyard?
TGO via ECC
What shall the switching performing operator attend prior to evolution?
pre job brief
What shall the switching performing operator have on hand during evolution?
switching instructions