Summary of Experience Questions Flashcards
Ethics, rules of conduct and professionalism - Level 3 - What happened at Town Street Farsley
Client requested to start project prior to confirmation of requirements for planning.
I showed restraint to their pressure to start early
Could have received a certificate for lawful development.
Client care - Level 2 - What Party Wall
Contract Practice - What are the legally binding principles?
Offer, consideration, acceptance and the intention to create a legal contract.
Contract Practice - What forms part of a letter of intent?
Acceptance of the contractors offer
The agreed contract sum
Instruction to proceed on a certain date. Site possession date.
Contract completion date
Terms of the contract
Confirmation of contractor insurance
LDs
Building Pathology - What happened at Bruntcliffe Trading Estate
Used a Drone to survey a roof water ingress issues
Building Pathology - Auction House, Leyburn
Foul water drainage blockages. Instructed a CCTV drainage survey, wrote letter report.
Building Pathology - Duchy of Lancaster
Water damaged timber. Schedule up repairs.
Building Pathology - Commercial Street Leeds
Pre-aqu survey at 1960s property. Lack of maintenance to the property resulted in water ingress and wet rotted timber windows. Section of defective steel within the basement, recommended that a SE review the steel prior to purchase.
Building Pathology - Lush Leeds
Victorian property in Leeds with water ingress issues. Noted ingress to internal downpipes. Exposed the pipework and revealed cracked cast iron downpipes.
Construction technology - Setting out of steels, RIBA stages, and CPD on retrofitting
Strategic definition, preparation and brief, concept design, spatial coordination, detailed design, manufacturing and construction, handover and use.
Construction technology - Haxby Hall
Acting as party wall surveyor development of a carehome. Over saw the installation of foundations such as strip and rotatory auger
Construction tech - Burton Stone Lane
Basement refurbishment, stepped brick foundation. Stepped brick foundation and removal of existing flooring. Recommended a SE specify an L shaped concrete foundation incorporating the drainage system.
Construction tech - Woods Auto Supplies
Water ingress to the timber northlight roof structure. Recommended further investigations. Instructed to proceed with full repairs scheme.
Contract Admin - Extension of time, practical completion and contract instruction.
EoT
practical completion
Contract instruction
Contract Admin - Latchmore Industrial Instruction?
Contract instruction. I issued a contract stating the specific work and