structured cabling test Chapters 9,10,11,12,13 Flashcards
ANSI/TIA/EIA-_______ standard specifies the administrative requirements of the telecomm infrastructure.
606-B
A unique identifier shall be marked on each cable, or its labels at each end. T/F
True
Each end of the horizontal cable shall be labeled within ____ of each end of the cable jacket?
12”
What are the 5 areas of infrastructure covered by ANSI/EIA/TIA 606A?
horizontal pathways and cabling backbone pathways and cabling Telecomm grounding and bonding spaces(EF,TR,ER,etc) firestopping
According to ANSI/TIA/EIA 606-A commercial buildings define each class Class 1 Class 2 Class 3 Class 4
infrastructures with only equipment rooms
infrastructures with one or more TR in a single building
infrastructures with multiple buildings at a single site
infrastructures with multiple sites or campuses
How are backbone cables administered?
ID containing both TR numbers and cable alpha numeric ID
How are horizontal cables administered?
Each 4 pair cables
whats the minimum number of telecom racks that must be installed in a TR before an identifier is required?
one
the color coding of termination hardware labels is based on the hierarchical star configuration for backbone cabling specified in the ANSI/EIA/TIA-568-B-1
T/F
true
Whats the correct type of labeling used between TR and WA?
machine printed label attached to cable
The administration label color for: horizontal cables first-level backbone cables second-level backbone cables common equipt ports
blue white grey purple pg134
PBB SBB RBB TBC TBB BBC
primary bonding busbar (TMGB) secondary bonding busbar (TGB) rack bonding busbar telecomm bonding conductor (BCT) telecomm bonding backbone backbone bonding conductor (GE)
minimum bend radius for a bonding conductor
8 times the bonding conductors diameter
when bonding to the metal frame of a building, all bonding conductors and connectors shall be listed for the purpose intended and approved by_____
UL (underwriters laboratories)
Commercial building bonding and grounding requirements for telecommunications
ANSI/J-STD-607-C
5 components associated with telecomm grounding and bonding infrastructure
PBB SBB RBB TBC TBB BBC
installing PBB and SBB in their respective locations, they shall be insulated for their supports with a(n) ______ separation
2”
Whats the purpose of running BBC between TRs and ERs first floor, top floor, and every third floor?
equalizing the potential between the PBB and TR(check)
minimum size of a bonding conductor
maximum size
copper #6 AWG
70,500 cmills
Whats the basic function of the BBC
reduce or equalize potential ground
The _____ conductor for telecommunications shall bond the PBB to the service equipment (power) ground
bonding
The _____ conductor for telecommunications shall bond the PBB to the service equipment (power) ground
bonding
Preparing a firewall in a TR that utilizes 300 pair 110 blocks. You install 225 cable drops located on the floor. How many 300 pair 110 blocks will be needed to properly terminate 225 four-pair horizontal cables?
4
225x5/300
When configuring an equip rack in a TR, its recommended that 1U cable horizontal cable management device be installed ______?
every other 1U