What is the primary purpose of blueprints?
Convey important information you need to know in regards to sizes and locations.
Specifications are ____
Word descriptions of the work to be done.
Specifications include:
Written descriptions of work to be done.
Information regarding what is to be done and how it is to be done.
Schedules consist of information presented in what form?
Chart or table form.
What always takes precedence over original drawings and specifications?
Revisions and Addenda
What is done to divisions of specifications for easier identification?
Numbered and color coded.
Schedule provides information on;
What goes where.
From highest precedence to lowest, what are the four types of information found in blueprints?
- Addenda
- Specifications
- Blueprint Revisions
- Original drawings
A drawing legend consists of what?
A table that shows the drawing numbers and sheet titles.
The information in construction documents is generally organized in what format?
From less detail to more detail.
What is the main purpose of Mechanical General Notes?
To provide additional directions for determining the general intent of the specifications.
What can schedules also describe?
Purchased components such as grilles, registers, motors, diffusers, VAV boxes or light fixtures.
What can schedules help with?
Help you avoid getting the wrong pieces delivered to the project while construction is underway.
What would the letters 1/A-8 with an arrow indicate on a drawing?
Indicate that more information can be found at the item labeled 1 on drawing A-8.
Although engineered specifications and schedules are available in many forms, their commonality is:
They are all designed to convey the correct information for proper fabrication and installation.