1
Q

What is the standard structure response?

A

1 BC, 3 Engines, 1 Truck, 1 Investigator. (+ 1 Engine if confirmed fire reports)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

RIC Tool Cash?

A

1 Flat Head Axe, Halligan, Spot Light, RIC Bottle, TIC, Search Line.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is a LUNAR report?

A

Location, Unit, Name, Assignment & Air, Resources Needed.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

RIC Should entry should be with pre- designated assignments for each crew member. What are they?

A

Firefighters- flat head axe and halligan. clearing the pathway of obstructions that would hamper rescue.
Captain- place a spot light at entrance if not previously done. Guides the FFs using the TIC
Engineer- Enters last carrying the RIC bottle and deploying a tag lie, which shall be anchored to the outside of the IDLH

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Acronym ABC

A

A- Air, B- Bypass, C- Cylinder

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

When confirmation is made by the IC the personnel are out of danger what will he do next.

A

Advise all personnel on to resume normal radio traffic.