SMR Design #1 - Micro small +LECTURE 5 Flashcards

1
Q

___ pressure

A

very low

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

___ safety

A

passive

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

____failure tolerant

A

single

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

type of regulation ___
__thermal

A

self regulating
isothermal

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Design Philosophy
* Proven____ technology developed by the Los Alamos National Laboratory for space
application.
* Does not use a ____ coolant
* heat is removed from its core using ____, limiting the number of its moving parts and
providing overall ____

A

heat pipe
bulk primary
passive heat pipes
plant simplicity.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q
  • The design utilizes the ___safety features to enhance safety and self-regulation
    capability in the
  • ___, moderator and
  • ____technology
A

inherent
fuel,
heat pipes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Pre-Licensing Vendor Design Review –
takes plave in __ phases, conducted
against related ____ regulatory
documents and Canadian codes &
standards
the doc is ____

A

3
CNSC
REGDOC 2.5.2

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Phase 1: Pre-Licensing Assessment of Compliance with Regulatory Requirements:

A

overall assessment of the vendor’s nuclear power plant design against the most recent CNSC design requirements for new nuclear power plants in Canada

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

3 phases are

A

Phase 1: Pre-Licensing Assessment of Compliance with Regulatory Requirements:

Phase 2: Pre-Licensing Assessment for Any
Potential Fundamental Barriers to Licensing

Phase 3: Follow-up

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Phase 2: Pre-Licensing Assessment for Any
Potential Fundamental Barriers to Licensing

A

a focus on identifying any potential fundamental barriers to licensing in Canada

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Phase 3: Follow-up

A

This phase allows the vendor to follow-up on certain aspects of Phase 2 findings by:

▪ seeking more information from the CNSC about a Phase 2 topic; and/or

▪ asking the CNSC to review activities taken by the vendor towards the reactor’s design readiness, following the completion of Phase 2.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

R&D Challenges Due to conceptual FOAK Designs
name all 6

A

materials
- higher temps
-irradiation damage

fuel
-modified designs need to be tested and qualified

hydrogen production
-methods
-coupling to plant

thermal hydraulics and safety

fuel cycles

cross-cutting groups (fuel cycles, hydrogen, economic evaluation, safety proliferation resistance) were formed within Gen 4

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

importance of SMRs
list 3

A

flexible systems that can be adapted for non-electric applications

can be integrated effectively into the energy systems supporting remote or large areas

opportunities to support applications beyond electricity generation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly