Melbourne Yard
10 roads 1x6 individually dwarfed controlled by RRLC
North Melb Sidings
belong to CGB 8 roads 1x6 share 1 dwarf WSA points controlled by western panel
Upfield
A,1,2,3,4 one is the running line
1x6 each dwarfed
Macauley Sidings
belong to upfield
1+2 light repairs
567 no comeng no coupling
werribee stabling locations?
altona sidings
newport workshop sidings
newport stabling sidings
altona sidings
used to terminate willimstown and laverton a trains
in newport
can be reached by both platforms
road 1 1x6
road 2 1x3
MBR on the running line side of road 1
Newport stabling sidings
15 roads- 3-8, 9-12 (baulked) 13-17 (through roads to the workshops)
controlled by newport
no points to fondle
1x6
everything has a dwarf
foggy weather 10kms
newport workshop sidings
sidings 1-3 2x6
siding 4 1x6 only
controlled by newport
racecourse
NMS is also a stabling location on the RCE line
platform 1 road 1 1x6
Platform 2 road 4 1x6
all accessible from down line
road 4 can shunt on top of a stabled train
2 and 3 out of service
BRAODMEADOWS
a 1x 6 is emergency only not to be used when platform 1 is busy
c 3x6 can be accessed from both platforms
a can be accessed from 2 with a S route indicator
CRAIGEBURN
25 roads 1x6
1 is wash 7 is lathe only stable in them last resort
dwarfed individually
19-25 workshops 19-21 outside
in groups of 6
watergardens
2 roads 3x6 accessible from 1 and 2
calder park sidings
operated by sunbury panel at CGB
9 sidings
1-6 2x6
10-12 3x6
dwarfed and accessible from the down
sunbury
controlled by sunbury
1 of 3 locations on the line
5 sidings a-e 1x6
a,b from 1 c,d,e from 2
no points on the sunbury line
sandringham
controlled by sandy, handed and we set points for a vacant road in the yard
1-4, one is the platform
3 and 4 share a dwarf