CFD Flashcards
terminating locations
Caulfield
Oakleigh
Westall
Springvale
Dandenong
berwick
Pakenham
Cranbourne
Hawksburn / South Yarra
where is the border for the country area
Dandenong
115km/h
high beams on
Speed CFD subway
25km/h
speed DNG platforms
60km/h max re: empties
Cranbourne platform speed
25km/h as per usual dead end platforms
Caulfield Signal Control Panel
metrol- RMD
transmitted or handed
SSCC sunshine signal control centre
SYA- CLA
transmitted
CBTC different safe working method
WTL panel at DNG
westall to springvale
transmitted or handed
Dandenong panel
DNG- PKN/CBE
transmitted or handed
terminating at hawksburn/SYA
hawksburn- down
plat 3/4 change ends take proceed
SYA on the up
platform 5 only, change ends, proceed (take permission to pass CBTC board)
terminating at CFD
down- route indicators will tell you either 3/4. change ends, signal aspect
up- platform 3 change ends take the signal back
terminating at Oakleigh
down- arrive 2 change ends, signal
up- arrive 1 change ends signal
terminating at Westall
down- platform 2, change ends, signal
down- platform 3, siding 1,A or B, arrive back plat 1or 2
up- arrive platform 1 change ends.
up- arrive 2/3 change ends return on the bypass (arrive on 2 can also depart down on 2)
terminating at SPG
down- take the diverge to arrive on platform 1, get route indicator U or B
down- arrive platform 2 take a Y or B
up- arrive 1, take a Y change ends come back into platform 2
Springvale route indicators
U- up
B- bypass
Y- yard