Erosion and sedimentary control must be approved on sites what size and larger?

A

1 acre

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Sediment basins must be built over what?

A

gravel

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Runoff must be diverted where?

A

across the slopes

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

Permanent ground cover sufficient to control erosion must be installed within how many working and calendar days (whichever is less), after construction is complete?

A

30 working days or 120 calendar days - whichever comes first

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Who enforces the law for sediment control?

A

Dept of ENR, Land Quality section

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

who is responsible?

A

the person financially responsible for disturbing the land

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

Penalties: max fine?

A

$5000.00/day per violation

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Penalties: Failure to submit a plan?

A

$1,000.00/day

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Penalties: violation of the plan?

A

$500.00/day

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Penalties: Admin stop work order or injunction issued by _____?

A

courts

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

leading reason for erosion and sediment control plan failure is ?

A

lack of maintenance

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

sediment is controlled most effective where?

A

near the source

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

temporary sediment trap: minimum flood pool volume is ?

A

1,800 cubic feet per acre drained (width at top 2 ft)

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What is process of sedimentation?

A

when soil particle slow enough in water to settle down to the bottom

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Minimum temporary gravel entrance?

A

12’ wide, 6” thick, and at least 50’ long