Section 3 - Sustainable thinking and integrative Process Flashcards

You may prefer our related Brainscape-certified flashcards:
1
Q

Systems Thinking?

A

Teams Thinking Together instead of individual Thinking

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

Leverage Points?

A

When a small Change in a complex System Causes Big Changes.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

Feedback Loops?

A

info Flows in a system allowing it to organize it self like Heating/cooling system.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

iterative process?

A

Process of calculating desired results by repeated cycle of operations.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

Product Lifecycle?

A

Mined in africa manufactured in india…. lifecycle has embodied energy from harvest, transportation…

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

Life Cycle Assessment ( LCA ); According to ISO 14040

A

Assess Env. Impacts caused by stages of Products from excavation to Grave.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

LCA has 4 Phases;

A

1- Goal and Scope; identify LCA purpose, expected outcome.

2- Life Cycle Inventory ( LCI ); stages of production are analyzed for energy used.

3- Life Cycle Impact Assessment; Evaluate Potential Env. Impacts for Energy and raw materials.

4- Interpretation; a Systematic technique to identify, evaluate, and check info from LCA and LCI.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Life Cycle Costing ( LCC )?

A

assessing cost effective options, according to initial and operational costs. How to maximize net savings.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

LCC Cost Types;

A

1-initial Cost.
2-O+M Cost.
3-Fuel Cost.
4-Disposal Cost.
5-Finance Cost
6-Non-Monetary Costs or Benefits.
7- Hard Costs.
8-Soft Costs.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Conventional Building Process ?

A

a Process that does not take into account current or new findings. - easier than other processes. But causes many problems, teams never reach target

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Whole Building Design Approach?

A

Views bldg as a system not diff isolated components, results in full integration between teams , better decisions.

*Result is integrated Design Process (IDP)+ integrated Team Process ( stakeholders ).

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

4 Main Components of a Successful Whole Bldg Design Approach…

A

1- Establish Vision , Set Design Performance Goals.
2- Forming Strong Collaborative Integrated Project Team.
3- Understand Requirements and outcomes of each phase.
4- adding sustainable Design Within the established Design Process.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Integrative Process?

A

comprehensive approach to bldg systems ; identify and use opportunities to achieve synergies across disciplines and bldg systems.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Reasons for Integrative Process?

A

1- High Performance and Sustainability Expectations.
2- Spreading Awareness to Developers and Designers.
3- adaptability and Flexibility during Entire Life Cycle.
4- Increased requirements causes by Complex Projects, and to avoid discrepancies between Diff Trades.
5- Avoid Excessive costs from isolated decisions.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Design objectives of integrative Process; to achieve a high-performing bldg.

A

1- Accessibility and Security.
2- Economical.
3- Operational.
4- Preservation.
5- Productivity.
6- Sustainable.

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

3 Phases of Integrative Process;

A

1- Discovery; During Predesign. Team gets familiar with integration
2- Implementation; During Design and Construction, teams use knowledge from discovery.
3-Operations; Measures performance during O+M.

17
Q

Integrated Design Process through Project Phases;

A

1- Phase 1 - Pre Design;
2- Phase 2 - Schematic Design;
3- Phase 3 - Design Development; Detailed drawings;
4- Phase 4 - Construction and Contract documents; IFC,
5- Phase 5 - Bidding, Construction, and Commissioning;
6- Phase 6 - Building Operations ( Start UP );
7- Phase 7 - PoST Occupancy