[S] BJ5 Make-to-Stock Production – Discrete Manufacturing Flashcards

1
Q

Describe the scope item BJ5 Make-to-Stock Production – Discrete Manufacturing.

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This scope item enables production planning in make-to-stock scenarios for a serial-number-managed finished good.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

How does the process of Make-to-Stock Production start?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

The process starts with the creation of a demand forecast for finished goods represented by Planned Independent Requirements (PIRs).

Based on PIRs, Material Requirements Planning (MRP) creates a production plan for finished goods and explodes the entire bill of material structure.

As a result, semi-finished component production and raw material demand is planned. Production planners can analyze and manually change the planned order-based production plan.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What does raw material demand lead to?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

Raw material demand leads to purchase requisitions that trigger alternative procurement scenarios referenced in this scope item.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

How is the production process covered?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

The production process itself is entirely covered by

  • using the conversion of planned into production orders
  • order release
  • material staging and picking
  • confirmation of order operations
  • and goods receipt posting.

Order-based target and actual cost is created, ensuring fully integrated material and value streams.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the key steps of Make-to-Stock Production?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A
  • Process planned independent requirements
  • Execute material requirements planning and evaluation of stock requirement list
  • Execute production order processing.
  • Run scrap reports optionally after production

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What are the benefits of BJ5 Make-to-Stock Production – Discrete Manufacturing?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A
  • Trigger production execution with a production plan
  • Explode the bill of material automatically when running the MRP
  • Calculate target costs during order creation
  • Improve usability with intuitive confirmation of production operations

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What are “Planned Independent Requirements”?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

Planned independent requirements are used to perform demand management functions.

A planned independent requirement contains one planned quantity and one date, or a number of planned independent requirements schedule lines, such as one planned quantity split over time according to dates.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

Explain the process step “Material Requirements Planning at Plant Level”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to use material requirement planning to tailor available capacities and receipts on time to suit requirement quantities. You can use MRP or consumption-based planning for this purpose.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

Explain the process step “Evaluate Stock/Requirements Situation”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to display the stock/requirements situation for the material in the stock/requirements list after the requirement planning has been performed.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

Explain the process step “Conversion to Production Orders for Subassembly and Final Assembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

The daily MRP run creates planned orders for goods that are to be produced internally.

This process step shows you how to convert the planned orders to production orders for both semi-finished goods and finished goods when the planned opening date is reached.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Explain the process step “Review Material Availability Status for Production Orders”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

You review the material availability status for production orders in this step.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

Explain the process step “Material Staging for Subassembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to stage materials for production. If there is sufficient stock available on the production storage location no line items are generated.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

Explain the process step “Release Production Order for Subassembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to release the order at header level, releases the order and all its operations. The order and the operations receive the REL (released) status.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

Explain the process step “Confirm Production Operations for Subassembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

The confirmation documents the processing status of orders, operations, sub-operations, and individual capacities. It is an instrument for controlling orders.

This process step shows you how to confirm the operations of the production order for the material. When you confirm the last operation, the system generates a goods movement document for the material. The backflush is carried out together with the confirmation steps.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

Explain the process step “Post Goods Receipt for Subassembly Production Order”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to post the goods receipt for the production order.

BJ5 Make-to-Stock Production – Discrete Manufacturing

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

Explain the process step “Material Staging for Final Assembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to stage materials for production. If there is sufficient stock available in the production storage location, no line items are generated.

BJ5 Make-to-Stock Production – Discrete Manufacturing

17
Q

Explain the process step “Release Production Order for Final Assembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

A release at order operation level results in the order and all its operations being released. The order and the operations receive the REL (released) status.

BJ5 Make-to-Stock Production – Discrete Manufacturing

18
Q

Explain the process step “Check Serial Numbers”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

The Finished Good material is managed with serial numbers. The system generates a serial number for each finished good when the production order is released. This process step shows you how to check the serial numbers.

BJ5 Make-to-Stock Production – Discrete Manufacturing

19
Q

Explain the process step “Pick Components for Final Assembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to pick the released production order.

For picking, the warehouse manager selects the specific picking list that can be called up directly with the production order number. Only those materials that are not in the service stock at the assembly aisle are to be picked.

BJ5 Make-to-Stock Production – Discrete Manufacturing

20
Q

Explain the process step “Confirm Production Operations for Final Assembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

The confirmation documents the processing status of orders, operations, sub-operations, and individual capacities. It is an instrument for controlling orders. This process step shows you how to use time event confirmation.

BJ5 Make-to-Stock Production – Discrete Manufacturing

21
Q

Explain the process step “Review Production Order”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

After the release or confirm of finished goods orders is performed, the production supervisor could display and check the order for the material.

BJ5 Make-to-Stock Production – Discrete Manufacturing

22
Q

Explain the process step “Final Confirmation of Production Operations for Final Assembly”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

In the common business practices, confirmations of all assembly activities of the production order are executed before posting the goods receipt. The backflush is carried out together with the confirmation steps.

BJ5 Make-to-Stock Production – Discrete Manufacturing

23
Q

Explain the process step “Post Goods Receipt for Final Assembly Production Order”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to post the goods receipt for the production order.

BJ5 Make-to-Stock Production – Discrete Manufacturing

24
Q

Explain the process step “Preview Goods Receipt Slip and Label (Optional)”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to preview the material document.

BJ5 Make-to-Stock Production – Discrete Manufacturing

25
Q

Explain the process step “Review Scrap Report”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to review the scrap report.

BJ5 Make-to-Stock Production – Discrete Manufacturing

26
Q

Explain the process step “Review Manufacturing Object Pages”

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

This process step shows you how to review different object pages available for different roles in the Manufacturing area.

BJ5 Make-to-Stock Production – Discrete Manufacturing

27
Q

What business roles use Make-to-Stock Production – Discrete Manufacturing (BJ5)?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A
  • Production Planner
  • Production Engineer - Discrete Manufacturing / Process Manufacturing
  • Production Supervisor - Discrete Manufacturing / Process Manufacturing
  • Production Operator - Discrete Manufacturing / Process Manufacturing
  • Warehouse Clerk

BJ5 Make-to-Stock Production – Discrete Manufacturing

28
Q

What configuration item enables you to specify whether a planned order can be converted to a production order/process order using collective conversion in the event of missing parts?

A: Define Material Type Assignments
B: Define Scheduling Parameters for Production Orders
C: Define Confirmation Parameters
D: Define Checking Control

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

D: You can specify whether a planned order can be converted to a production/process order using collective conversion in the event of missing parts with the Define Checking Control configuration item.

BJ5 Make-to-Stock Production – Discrete Manufacturing

29
Q

Which of the following SAP Fiori apps are associated with the Make-to-Stock Production – Discrete Manufacturing (BJ5) scope item?

A: Manage Sales Orders
B: Manage PIRs
C: Material Scrap
D: Sales Quotation

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

B, C: Managing PIRs is relevant for planning demand before sales orders exist in make-to-stock production. Comparing planned scrap with actual scrap is also typical for make-to-stock. In contrast to this, management of sales orders and sales quotations is relevant for make-to-order production, where sales orders trigger the production and assembly of finished goods.

BJ5 Make-to-Stock Production – Discrete Manufacturing

30
Q

Which of the following process steps is irrelevant to the Make-to-Stock Production — Discrete Manufacturing (BJ5) scope item?

A: Check Serial Numbers
B: Pick Components
C: Create Product Cost Collector
D: Material Requirements Planning

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

C: Picking components (as part of material staging), checking the serial number, and material requirements planning as part of the production planning process are valid. A product cost collector — if needed — belongs to Controlling master data and is not part of this process.

BJ5 Make-to-Stock Production – Discrete Manufacturing

31
Q

In the Make-to-Stock Production — Discrete Manufacturing (BJ5) scope item, the make-to-stock process is triggered for every sales order. Once the product has been produced for the sales order, it is put on sales order stock and the sales order can be delivered.

A: False
B: True

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

A: Make-to-stock does not produce specifically for a sales order, nor is sales order stock created. Make-to-stock also produces for PIRs and the product is always put on (anonymous) stock.

BJ5 Make-to-Stock Production – Discrete Manufacturing

32
Q

What are the production steps withing production execution?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A
  • Material staging
  • Order release
  • Order confirmation
  • Material movement postings for goods issue and goods receipt including available-to-promise checks

BJ5 Make-to-Stock Production – Discrete Manufacturing

33
Q

How are independent requirements used in mass processing?

BJ5 Make-to-Stock Production – Discrete Manufacturing

A

Instead of creating a single requirement, sometimes a requirements plan that includes one or more planned independent requirements can be maintained for mass processing. In this case, the requirements are grouped and maintained under a requirement plan number.

BJ5 Make-to-Stock Production – Discrete Manufacturing