[S] 3LO Change Manufacturing Bill of Material for Production Flashcards

1
Q

What does 3LO Change Manufacturing Bill of Material for Production cover?

3LO Change Manufacturing Bill of Material for Production

A

This scope item covers the change-master-controlled updates of a manufacturing BOM (MBOM) that is used for the production process of components.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
2
Q

What does the change-number-controlled approach allow?

3LO Change Manufacturing Bill of Material for Production

A

The change-number-controlled approach allows date-efficacy-based attribute management on the MBOM header level and the bill of material (BOM) item level.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
3
Q

What is the change-number-controlled update process followed by?

3LO Change Manufacturing Bill of Material for Production

A

The change-number-controlled update process is followed by the production process which uses the recently updated MBOM.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
4
Q

What are the key process steps for 3LO Change Manufacturing Bill of Material for Production?

3LO Change Manufacturing Bill of Material for Production

A
  • Create change master
  • Change change master
  • Exchange a material or component in MBOM
  • Create production order manually

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
5
Q

What are the benefits of 3LO Change Manufacturing Bill of Material for Production?

3LO Change Manufacturing Bill of Material for Production

A

Control updates in bill of materials for production centrally with change master
Manage the effective changed day in change master

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
6
Q

What does the process step “Create Change Master” do?

3LO Change Manufacturing Bill of Material for Production

A

This process step shows you how to create the Change Master that will be used for exchanging a material of the current Bill of Material to a different material.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
7
Q

What does the process step “Exchange a Component in the MBOM” do?

3LO Change Manufacturing Bill of Material for Production

A

This process step shows you how to exchange one of the materials with another material which will be used for production moving forward. Changing the bill of material is done in the Change Master to track the change and stay compliant.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
8
Q

What does the process step “Set Change Master Status to Inactive” do?

3LO Change Manufacturing Bill of Material for Production

A

This process step shows you how to set the Change Master Status to Inactive to make sure a specific Change Master can no longer be used to manage further changes.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
9
Q

What does the process step “Manually Create Production Order” do?

3LO Change Manufacturing Bill of Material for Production

A

This process step shows you how to create a production order and verify the new component has been successfully adopted.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
10
Q

What does the process step “Change to Original Component in the MBOM” do?

3LO Change Manufacturing Bill of Material for Production

A

This process step shows you how to create a new Change Master to change the bill of material again to revert back to the original component.

This could happen if for example, the supplier of the original component resolved a quality issue that led to you not being able to use the component in the first place, and now the issue is fixed, you want to revert back to the original component because it has a lower cost.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
11
Q

Which business roles have access to 3LO Change Manufacturing Bill of Material for Production?

3LO Change Manufacturing Bill of Material for Production

A
  • BOM Engineer (SAP_BR_BOM_ENGINEE)
  • Production Supervisor - Discrete Manufacturing (SAP_BR_PRODN_SUPERVISOR_DISC)

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
12
Q

When is the scope per change number released in the Change Manufacturing Bill of Material for Production (3LO) business process?
A: When the change number status is set to inactive
B: When the change number status is set to active
C: When the production order is created
D: When the change master is created

3LO Change Manufacturing Bill of Material for Production

A

A: The scope per change number is released when the change number status is set to inactive.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
13
Q

What is each BOM known as if you have more than one Bill of Material (BOM) created for the same material and usage?
A: Copied BOM
B: Duplicate BOM
C: Alternative BOM
D: Replicated BOM

3LO Change Manufacturing Bill of Material for Production

A

C: If you have more than one BOM created for the same material and usage, each BOM is known as an Alternative BOM.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
14
Q

What can be used in an MRP run to calculate material requirements, or in a transaction such as a production order?
A: Production material
B: Semi-finished material
C: Procured material
D: Raw material

3LO Change Manufacturing Bill of Material for Production

A

B+D: Raw material and semi-finished material are examples of components that can be used in an MRP run to calculate material requirements, or in a transaction such as a production order.

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
15
Q

If the supplier of a component in the original Bill of Material (BOM) is not able to deliver the component on-time, what must you do?
A: Create a quality inspection for the component
B: Change the Change Master for the original BOM
C: Create a Change Master to change the original BOM
D: Create a new BOM

3LO Change Manufacturing Bill of Material for Production

A

C: You must create a Change Master to change the original BOM to exchange the current material the supplier cannot deliver on-time with a different material (likely from a different supplier).

3LO Change Manufacturing Bill of Material for Production

How well did you know this?
1
Not at all
2
3
4
5
Perfectly
16
Q

What happens if you set the change number status to inactive?

3LO Change Manufacturing Bill of Material for Production

A

Setting the change number status to inactive releases the scope per change number. Once the status becomes inactive, changes are no longer possible. The MBOM header and items can only be changed with a new active change number. The change iteration process starts and ends again with setting the change number status to inactive.

3LO Change Manufacturing Bill of Material for Production